X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0764060214030

Well Details

Well ID: 0764060214030
Loading map...
Location: 03/14-02-076-06W4/0
Location Alias: 03/14-02-76-06 W4M
Location Alias 2: 03/14-02-076-06 W4/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 4
Range: 06
Section: 02
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: CVE FCCL B07P09 KIRBY 14-2-76-6
Operator Name: Cenovus Energy Inc.
License Number: 0461774
License Date: 2013-12-03
License Status: Issued
Spud Date: 2014-02-26
Final Drill Date: 2014-03-19
Well Total Depth: 1664.00 m
Surface Hole Latitude: 55.572285
Surface Hole Longitude: -110.812309

For data sources see[1][2]

Well History

Date Event
2013-12-03 Obtained License
2014-02-20 Conductor Casing Operation Performed
2014-02-26 Direction Drilling Operation Performed - Deviate
2014-02-26 Surface Casing Operation Performed
2014-03-06 Direction Drilling Operation Performed - Horizontal
2014-03-19 Finished Drilling
2014-03-19 Perforation Treatment Performed - Open-Hole Completion
2014-03-19 Perforation Treatment Performed - Slotted Liner or Casing
2014-03-19 Well Log Performed
2014-03-19 Well Mode changed to Drilled and Cased
2014-03-20 Liner Casing Operation Performed
2014-03-20 Rig Released
2014-05-17 Well Log Performed
2014-05-20 Well Log Performed
2015-10-15 Well Began Production
2015-10-15 Well Type changed to Steam Assisted Gravity Drain

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-03-05 Akita Drilling Ltd. 26 N/A Resumption
2014-02-26 Akita Drilling Ltd. 26 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-02-26 87.70 Deviate (5 - 79 degrees)
2014-03-06 593.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-03-19 Slotted Liner 680.00 1651.00 0
2014-03-19 Open Hole/Barefoot Completion 1651.00 1664.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 561 0.0 0.0 0.0
2016 8610 0.0 0.0 0.0
2017 8234 0.0 0.0 0.0
2018 8742 0.0 0.0 0.0
2019 6169 0.0 0.0 0.0
2020 2182 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-03-20 No Incident Encountered 0.00 0.00
2014-04-19 No Incident Encountered 0.00 0.00
2014-06-27 No Incident Encountered 0.00 0.00

For data sources see[8]

References