X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0764051002AA0

Well Details

Well ID: 0764051002AA0
Loading map...
Location: AA/02-10-076-05W4/0
Location Alias: AA/02-10-76-05 W4M
Location Alias 2: AA/02-10-076-05 W4/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 4
Range: 05
Section: 10
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: CVE FCCL C2 HARDY 2-10-76-5
Operator Name: Cenovus Energy Inc.
License Number: 0441358
License Date: 2011-12-15
License Status: RecCertified
Spud Date: 2012-01-24
Final Drill Date: 2012-01-27
Well Total Depth: 446.50 m
Surface Hole Latitude: 55.565149
Surface Hole Longitude: -110.689127

For data sources see[1][2]

Well History

Date Event
2011-02-03 Well Log Performed
2011-12-15 Obtained License
2012-01-24 Surface Casing Operation Performed
2012-01-27 Finished Drilling
2012-01-27 Production Casing Operation Performed
2012-01-27 Rig Released
2012-01-27 Well Log Performed
2012-01-27 Well Mode changed to Drilled and Cased
2012-01-31 Well Log Performed
2012-02-03 Perforation Treatment Performed - Jet Perforation
2012-02-04 Perforation Treatment Performed - Jet Perforation
2012-02-04 Well Log Performed
2012-02-05 Perforation Treatment Performed - Jet Perforation
2012-02-05 Well Log Performed
2012-03-07 Perforation Treatment Performed - Cement Plug
2012-03-07 Perforation Treatment Performed - Cement Squeeze
2012-03-07 Plug Back Performed
2012-03-07 Well Mode changed to Abandoned Zone
2016-04-25 Well Abandoned
2016-04-25 Well Mode changed to Abandoned

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-24 Savanna Drilling Corp. 425 N/A Drill To LD

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-03 Perforation 394.90 395.40 17
2012-02-03 Perforation 413.00 413.50 17
2012-02-04 Perforation 356.00 356.50 17
2012-02-04 Perforation 365.00 365.50 17
2012-02-04 Perforation 376.00 376.50 17
2012-02-05 Perforation 343.50 344.00 17
2012-03-07 Cement Squeeze 413.00 413.50 0
2012-03-07 Cement Squeeze 394.90 395.40 0
2012-03-07 Cement Plug 7.00 432.00 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-02-06 No Incident Encountered 0.00 0.00
2012-03-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References