X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0764050712020

Well Details

Well ID: 0764050712020
Loading map...
Location: 02/12-07-076-05W4/0
Location Alias: 02/12-07-76-05 W4M
Location Alias 2: 02/12-07-076-05 W4/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 4
Range: 05
Section: 07
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: CVE FCCL B12P07 HARDY 12-7-76-5
Operator Name: Cenovus Energy Inc.
License Number: 0483938
License Date: 2017-06-08
License Status: Suspension
Spud Date: 2017-08-25
Final Drill Date: 2017-10-09
Well Total Depth: 1515.00 m
Surface Hole Latitude: 55.581798
Surface Hole Longitude: -110.775925

For data sources see[1][2]

Well History

Date Event
2017-06-08 Obtained License
2017-08-08 Conductor Casing Operation Performed
2017-08-25 Direction Drilling Operation Performed - Deviate
2017-08-25 Well Mode changed to Preset
2017-08-26 Direction Drilling Operation Performed - Horizontal
2017-08-26 Surface Casing Operation Performed
2017-09-23 Well Log Performed
2017-09-24 Intermediate Casing Operation Performed
2017-10-09 Finished Drilling
2017-10-09 Liner Casing Operation Performed
2017-10-09 Perforation Treatment Performed - Open-Hole Completion
2017-10-09 Perforation Treatment Performed - Slotted Liner or Casing
2017-10-09 Rig Released
2017-10-09 Well Log Performed
2017-10-09 Well Mode changed to Drilled and Cased
2017-10-22 Well Log Performed
2019-12-14 Well Began Production
2019-12-14 Well Type changed to Steam Assisted Gravity Drain

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-10-07 Akita Drilling Ltd. 26 N/A Resumption
2017-08-25 Akita Drilling Ltd. 26 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-08-25 78.70 Deviate (5 - 79 degrees)
2017-08-26 646.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-10-09 Slotted Liner 733.00 1502.00 0
2017-10-09 Open Hole/Barefoot Completion 1502.00 1515.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 129 0.0 0.0 0.0
2020 1118 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-08-26 No Incident Encountered 0.00 0.00
2017-10-09 No Incident Encountered 0.00 0.00
2018-02-16 No Incident Encountered 0.00 0.00

For data sources see[8]

References