X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0764050707F10

Well Details

Well ID: 0764050707F10
Loading map...
Location: F1/07-07-076-05W4/0
Location Alias: F1/07-07-76-05 W4M
Location Alias 2: F1/07-07-076-05 W4/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 4
Range: 05
Section: 07
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: CVE FCCL 12-7 A7 HARDY 7-7-76-5
Operator Name: Cenovus Energy Inc.
License Number: 0486196
License Date: 2017-11-08
License Status: Issued
Spud Date: 2017-11-26
Final Drill Date: 2017-12-01
Well Total Depth: 1382.00 m
Surface Hole Latitude: 55.573280
Surface Hole Longitude: -110.778268

For data sources see[1][2]

Well History

Date Event
2017-11-08 Obtained License
2017-11-22 Conductor Casing Operation Performed
2017-11-26 Direction Drilling Operation Performed - Deviate
2017-11-27 Surface Casing Operation Performed
2017-11-28 Direction Drilling Operation Performed - Horizontal
2017-11-29 Intermediate Casing Operation Performed
2017-12-01 Finished Drilling
2017-12-01 Liner Casing Operation Performed
2017-12-01 Perforation Treatment Performed - Open-Hole Completion
2017-12-01 Perforation Treatment Performed - Slotted Liner or Casing
2017-12-01 Well Log Performed
2017-12-01 Well Mode changed to Drilled and Cased
2017-12-02 Rig Released
2018-01-05 Well Began Production
2018-01-05 Well Fluid changed to Water
2018-01-05 Well Type changed to Source

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-11-26 Precision Drilling Corporation 255 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-11-26 102.20 Deviate (5 - 79 degrees)
2017-11-28 374.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-12-01 Slotted Liner 455.00 1370.00 0
2017-12-01 Open Hole/Barefoot Completion 1370.00 1382.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 7247 0.0 0.0 0.0
2019 8303 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-12-02 No Incident Encountered 0.00 0.00

For data sources see[8]

References