If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0764043615F10 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.635469,"lon":-110.477329,"icon":""}]} |
Location: F1/15-36-076-04W4/0 | |
Location Alias: F1/15-36-76-04 W4M | |
Location Alias 2: F1/15-36-076-04 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 4 | |
Range: 04 | |
Section: 36 | |
County/Municipality: Regional Municipality of Wood Buffalo | |
Well Name: CVE FCCL 1-1 D15 HARDY 15-36-76-4 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0489589 | |
License Date: 2018-06-15 | |
License Status: Issued | |
Spud Date: 2018-08-03 | |
Final Drill Date: 2018-08-11 | |
Well Total Depth: 508.00 m | |
Surface Hole Latitude: 55.635469 | |
Surface Hole Longitude: -110.477329 |
Date | Event |
---|---|
2018-06-15 | Obtained License |
2018-08-03 | Direction Drilling Operation Performed - Deviate |
2018-08-03 | Surface Casing Operation Performed |
2018-08-11 | Finished Drilling |
2018-08-11 | Production Casing Operation Performed |
2018-08-11 | Rig Released |
2018-08-11 | Well Log Performed |
2018-08-11 | Well Mode changed to Drilled and Cased |
2018-09-13 | Perforation Treatment Performed - Jet Perforation |
2018-09-13 | Well Log Performed |
2018-09-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-08-03 | Precision Drilling Corporation | 199 | N/A | Set Surface |
2018-08-10 | Precision Drilling Corporation | 199 | N/A | Resumption |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-08-03 | 100.80 | Deviate (5 - 79 degrees) |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-09-13 | Perforation | 422.00 | 428.00 | 20 |
2018-09-26 | Acid Treatment | 422.00 | 484.00 | 0 |
2018-09-13 | Perforation | 428.00 | 434.00 | 20 |
2018-09-13 | Perforation | 434.00 | 440.00 | 20 |
2018-09-13 | Perforation | 440.00 | 446.00 | 20 |
2018-09-13 | Perforation | 457.00 | 462.00 | 20 |
2018-09-13 | Perforation | 462.00 | 467.00 | 20 |
2018-09-13 | Perforation | 467.00 | 472.00 | 20 |
2018-09-13 | Perforation | 472.00 | 478.00 | 20 |
2018-09-13 | Perforation | 478.00 | 484.00 | 20 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-08-11 | No Incident Encountered | 0.00 | 0.00 |
2018-10-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]