X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0756133502000

Well Details

Well ID: 0756133502000
Loading map...
Location: 00/02-35-075-13W6/0
Location Alias: 00/02-35-75-13 W6M
Location Alias 2: 00/02-35-075-13 W6/00
Country: Canada
Province: Alberta
Township: 075
Meridian: 6
Range: 13
Section: 35
County/Municipality: Saddle Hills County
Well Name: AVN HZ SINCLAIR 2-35-75-13
Operator Name: Advantage Oil & Gas Ltd.
License Number: 0434408
License Date: 2011-06-16
License Status: Issued
Spud Date: 2011-09-01
Final Drill Date: 2011-09-28
Well Total Depth: 4492.00 m
Surface Hole Latitude: 55.549295
Surface Hole Longitude: -119.919013

For data sources see[1][2]

Well History

Date Event
2011-06-16 Obtained License
2011-09-03 Surface Casing Operation Performed
2011-09-07 Direction Drilling Operation Performed - Horizontal
2011-09-11 Well Log Performed
2011-09-28 Finished Drilling
2011-09-28 Well Log Performed
2011-09-28 Well Mode changed to Drilled and Cased
2011-09-30 Production Casing Operation Performed
2011-09-30 Rig Released
2011-11-21 Well Log Performed
2011-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-12-02 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-12-03 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-12-04 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-12-05 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-12-06 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-12-07 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-12-08 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-12-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-10 Well Began Production
2012-03-10 Well Fluid changed to Gas
2012-03-10 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-07 2253.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-02 Multi-Stage Fracture 4464.00 4465.00 0
2011-12-03 Multi-Stage Fracture 3980.00 3981.00 0
2011-12-03 Acid Treatment 3980.00 3981.00 0
2011-12-03 Multi-Stage Fracture 3859.00 3860.00 0
2011-12-03 Multi-Stage Fracture 3844.00 3854.00 0
2011-12-03 Acid Treatment 3844.00 3860.00 0
2011-12-04 Multi-Stage Fracture 3738.00 3755.00 0
2011-12-04 Multi-Stage Fracture 3720.00 3728.00 0
2011-12-04 Acid Treatment 3720.00 3755.00 0
2011-12-05 Multi-Stage Fracture 3580.00 3590.00 0
2011-12-05 Acid Treatment 3580.00 3590.00 0
2011-12-02 Acid Treatment 4464.00 4465.00 0
2011-12-05 Multi-Stage Fracture 3478.00 3482.00 0
2011-12-05 Multi-Stage Fracture 3460.00 3470.00 0
2011-12-05 Acid Treatment 3460.00 3482.00 0
2011-12-06 Multi-Stage Fracture 3360.00 3370.00 0
2011-12-06 Acid Treatment 3360.00 3370.00 0
2011-12-06 Multi-Stage Fracture 3235.00 3245.00 0
2011-12-06 Acid Treatment 3235.00 3245.00 0
2011-12-07 Multi-Stage Fracture 3125.00 3135.00 0
2011-12-07 Multi-Stage Fracture 3112.00 3120.00 0
2011-12-07 Acid Treatment 3112.00 3135.00 0
2011-12-02 Multi-Stage Fracture 4343.00 4344.00 0
2011-12-08 Multi-Stage Fracture 2970.00 2980.00 0
2011-12-08 Acid Treatment 2970.00 2980.00 0
2011-12-08 Multi-Stage Fracture 2860.00 2870.00 0
2011-12-08 Multi-Stage Fracture 2852.00 2858.00 0
2011-12-08 Acid Treatment 2852.00 2870.00 0
2011-12-09 Multi-Stage Fracture 2740.00 2748.00 0
2011-12-09 Acid Treatment 2740.00 2748.00 0
2011-12-09 Multi-Stage Fracture 2630.00 2640.00 0
2011-12-09 Acid Treatment 2630.00 2640.00 0
2011-12-02 Acid Treatment 4343.00 4344.00 0
2011-12-02 Multi-Stage Fracture 4222.00 4223.00 0
2011-12-02 Acid Treatment 4222.00 4223.00 0
2011-12-03 Multi-Stage Fracture 4101.00 4102.00 0
2011-12-03 Multi-Stage Fracture 4091.00 4096.00 0
2011-12-03 Acid Treatment 4091.00 4102.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6971 0.0 0.0 0.0
2013 8542 0.0 0.0 0.0
2014 7788 0.0 0.0 0.0
2015 5035 0.0 0.0 0.0
2016 6455 0.0 0.0 0.0
2017 7003 0.0 0.0 0.0
2018 6729 0.0 0.0 0.0
2019 6468 0.0 0.0 0.0
2020 1978 0.0 0.0 0.0

For data sources see[6]

References