X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0756112413030

Well Details

Well ID: 0756112413030
Loading map...
Location: 03/13-24-075-11W6/0
Location Alias: 03/13-24-75-11 W6M
Location Alias 2: 03/13-24-075-11 W6/00
Country: Canada
Province: Alberta
Township: 075
Meridian: 6
Range: 11
Section: 24
County/Municipality: Saddle Hills County
Well Name: AVN 103 HZ VALHALLA 13-24-75-11
Operator Name: Advantage Oil & Gas Ltd.
License Number: 0491713
License Date: 2018-11-01
License Status: Amended
Spud Date: 2019-01-03
Final Drill Date: 2019-01-11
Well Total Depth: 3968.00 m
Surface Hole Latitude: 55.517450
Surface Hole Longitude: -119.552924

For data sources see[1][2]

Well History

Date Event
2018-11-01 Obtained License
2019-01-04 Surface Casing Operation Performed
2019-01-05 Direction Drilling Operation Performed - Deviate
2019-01-09 Direction Drilling Operation Performed - Horizontal
2019-01-09 Well Log Performed
2019-01-11 Finished Drilling
2019-01-11 Well Log Performed
2019-01-11 Well Mode changed to Drilled and Cased
2019-01-12 Production Casing Operation Performed
2019-01-12 Rig Released
2019-06-22 Well Log Performed
2019-07-09 Perforation Treatment Performed - Multi-Stage Fracture
2019-07-10 Perforation Treatment Performed - Multi-Stage Fracture
2019-07-11 Perforation Treatment Performed - Multi-Stage Fracture
2019-07-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-07-13 Perforation Treatment Performed - Multi-Stage Fracture
2019-07-14 Perforation Treatment Performed - Multi-Stage Fracture
2019-07-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-07-16 Perforation Treatment Performed - Multi-Stage Fracture
2019-07-17 Perforation Treatment Performed - Multi-Stage Fracture
2019-08-01 Well Began Production
2019-08-01 Well Fluid changed to Gas
2019-08-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-01-03 Horizon Drilling Inc. 30 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-01-05 542.20 Deviate (5 - 79 degrees)
2019-01-09 2530.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-07-09 Multi-Stage Fracture 3920.80 3934.20 0
2019-07-11 Multi-Stage Fracture 3608.20 3608.30 0
2019-07-11 Multi-Stage Fracture 3582.40 3582.50 0
2019-07-12 Multi-Stage Fracture 3556.20 3556.30 0
2019-07-12 Multi-Stage Fracture 3530.10 3530.20 0
2019-07-12 Multi-Stage Fracture 3504.00 3504.10 0
2019-07-12 Multi-Stage Fracture 3477.70 3477.80 0
2019-07-12 Multi-Stage Fracture 3451.50 3451.60 0
2019-07-12 Multi-Stage Fracture 3425.30 3425.40 0
2019-07-13 Multi-Stage Fracture 3400.10 3400.20 0
2019-07-13 Multi-Stage Fracture 3374.20 3374.30 0
2019-07-09 Multi-Stage Fracture 3894.70 3894.80 0
2019-07-13 Multi-Stage Fracture 3348.10 3348.20 0
2019-07-13 Multi-Stage Fracture 3322.30 3322.40 0
2019-07-13 Multi-Stage Fracture 3296.30 3296.40 0
2019-07-13 Multi-Stage Fracture 3270.60 3270.70 0
2019-07-14 Multi-Stage Fracture 3245.80 3245.90 0
2019-07-14 Multi-Stage Fracture 3219.90 3220.00 0
2019-07-14 Multi-Stage Fracture 3194.50 3194.60 0
2019-07-14 Multi-Stage Fracture 3168.60 3168.70 0
2019-07-14 Multi-Stage Fracture 3142.50 3142.60 0
2019-07-14 Multi-Stage Fracture 3116.70 3116.80 0
2019-07-09 Multi-Stage Fracture 3868.40 3868.50 0
2019-07-15 Multi-Stage Fracture 3090.60 3090.70 0
2019-07-15 Multi-Stage Fracture 3064.70 3064.80 0
2019-07-15 Multi-Stage Fracture 3038.70 3038.80 0
2019-07-15 Multi-Stage Fracture 3012.90 3013.00 0
2019-07-15 Multi-Stage Fracture 2986.80 2986.90 0
2019-07-15 Multi-Stage Fracture 2960.90 2961.00 0
2019-07-15 Multi-Stage Fracture 2934.90 2935.00 0
2019-07-16 Multi-Stage Fracture 2908.50 2908.60 0
2019-07-16 Multi-Stage Fracture 2882.10 2882.20 0
2019-07-16 Multi-Stage Fracture 2855.90 2856.00 0
2019-07-09 Multi-Stage Fracture 3842.20 3842.30 0
2019-07-16 Multi-Stage Fracture 2829.70 2829.80 0
2019-07-16 Multi-Stage Fracture 2803.40 2803.50 0
2019-07-16 Multi-Stage Fracture 2777.10 2777.20 0
2019-07-17 Multi-Stage Fracture 2751.00 2751.10 0
2019-07-17 Multi-Stage Fracture 2724.80 2724.90 0
2019-07-17 Multi-Stage Fracture 2698.40 2698.50 0
2019-07-17 Multi-Stage Fracture 2672.20 2672.30 0
2019-07-17 Multi-Stage Fracture 2646.10 2646.20 0
2019-07-17 Multi-Stage Fracture 2619.70 2619.80 0
2019-07-17 Multi-Stage Fracture 2593.50 2593.60 0
2019-07-10 Multi-Stage Fracture 3816.10 3816.20 0
2019-07-10 Multi-Stage Fracture 3789.90 3790.00 0
2019-07-10 Multi-Stage Fracture 3763.60 3763.70 0
2019-07-10 Multi-Stage Fracture 3737.40 3737.50 0
2019-07-11 Multi-Stage Fracture 3634.20 3634.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-07-09 2019-07-17 2,422 27,467 N/A
2 2019-07-10 2019-07-17 2,422 0 N/A
3 2019-07-14 2019-07-14 2,422 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 hydrochloric acid 7647-01-0 100 0.8951 N/A
water Not Available 100 47.8552 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 5.7776 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 3.3417 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0116 N/A
dibromoacetonitrile 3252-43-5 100 0.0116 N/A
non-hazardous ingredients Not Available 100 0.0116 N/A
polyethylene glycol 25322-68-3 100 0.0116 N/A
sodium bromide 7647-15-6 100 0.0116 N/A
Breaker HT Trican Breaker ammonium persulfate 7727-54-0 100 0.0017 N/A
non-hazardous ingredients Not Available 100 0.0017 N/A
pH-13W Trican Buffer methanol 67-56-1 100 0.0307 N/A
non-hazardous ingredients Not Available 100 0.0307 N/A
sodium hydroxide 1310-73-2 100 0.0307 N/A
CC-10 Trican Clay Control non-hazardous ingredients Not Available 100 0.1007 N/A
AI-12 Trican Corrosion Inhibitor 1-decanol 112-30-1 100 0.0022 N/A
1-octanol 111-87-5 100 0.0022 N/A
branched nonylphenol polyethylene glycol ether 127087-87-0 100 0.0022 N/A
cinnamaldehyde 104-55-2 100 0.0022 N/A
dipropylene glycol monomethyl ether 34590-94-8 100 0.0022 N/A
ethylene glycol 107-21-1 100 0.0022 N/A
formic acid 64-18-6 100 0.0022 N/A
isopropanol 67-63-0 100 0.0022 N/A
tar bases. quinoline derives 68513-87-1 100 0.0022 N/A
tar bases. quinoline derives.. benzyl chloride-quaternized 72480-70-7 100 0.0022 N/A
triethyl phosphate 78-40-0 100 0.0022 N/A
WXB-17 Trican Crosslinker monoethanolamine 141-43-5 100 0.0289 N/A
monoethanolamine borate 26038-87-9 100 0.0289 N/A
non-hazardous ingredients Not Available 100 0.0289 N/A
DF-2W Trican Defoamer non-hazardous ingredients Not Available 100 0.0004 N/A
propylene glycol 57-55-6 100 0.0004 N/A
FR-24 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0462 N/A
non-hazardous ingredients Not Available 100 0.0462 N/A
WG-111DSA Trican Gelling Agent non-hazardous ingredients Not Available 100 0.0371 N/A
IC-3 Trican Iron Control sodium nitrilo-triacetate. monohydrate 18662-53-8 100 0.0051 N/A
NMR-1N Trican Surfactant methanol 67-56-1 100 0.0449 N/A
non-hazardous ingredients Not Available 100 0.0449 N/A
S-4W Trican Surfactant diethanolamine 111-42-2 100 0.0101 N/A
fatty acid alkanolamide 68603-42-9 100 0.0101 N/A
fatty acids. coco. compds. with diethanolamine 61790-63-4 100 0.0101 N/A
methanol 67-56-1 100 0.0101 N/A
phosphoric acid. mixed decyl and
octyl esters. compds. with diethanolamine
68425-57-0 100 0.0101 N/A
2 N2 7727-37-9 100 0.8273 N/A
3 WG-111DA Trican Gelling Agent fumaric acid 110-17-8 100 0.0261 N/A
guar gum 9000-30-0 100 0.0261 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-06-26 2019-06-26 Central Water Distribution Facility 29
2019-06-26 2019-06-26 Central Water Distribution Facility 3321
2019-07-03 2019-07-18 Surface Water - Lake 24411

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 2518 0.0 0.0 0.0
2020 1821 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-12 No Incident Encountered 0.00 0.00
2019-07-17 No Incident Encountered 0.00 0.00

For data sources see[10]

References