X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0756091216040

Well Details

Well ID: 0756091216040
Loading map...
Location: 04/16-12-075-09W6/0
Location Alias: 04/16-12-75-09 W6M
Location Alias 2: 04/16-12-075-09 W6/00
Country: Canada
Province: Alberta
Township: 075
Meridian: 6
Range: 09
Section: 12
County/Municipality: County of Grande Prairie No. 1
Well Name: SURGE ENERGY 104 VALHALLA 16-12-75-9
Operator Name: Surge Energy Inc.
License Number: 0485270
License Date: 2017-09-05
License Status: Amended
Spud Date: 2018-04-19
Final Drill Date: 2018-05-05
Well Total Depth: 3301.00 m
Surface Hole Latitude: 55.479269
Surface Hole Longitude: -119.240228

For data sources see[1][2]

Well History

Date Event
2017-09-05 Obtained License
2018-04-20 Surface Casing Operation Performed
2018-04-21 Direction Drilling Operation Performed - Deviate
2018-04-30 Direction Drilling Operation Performed - Horizontal
2018-04-30 Well Log Performed
2018-05-01 Intermediate Casing Operation Performed
2018-05-05 Finished Drilling
2018-05-05 Well Log Performed
2018-05-05 Well Mode changed to Drilled and Cased
2018-05-07 Liner Casing Operation Performed
2018-05-08 Rig Released
2018-05-15 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-16 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-18 Well Began Production
2018-05-18 Well Fluid changed to Crude Oil
2018-05-18 Well Mode changed to Flowing
2019-02-01 Well Fluid changed to Crude Oil
2019-02-01 Well Mode changed to Gas Lift

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-04-19 Star Valley Drilling Ltd. 202 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-04-21 524.80 Deviate (5 - 79 degrees)
2018-04-30 2180.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-05-15 Multi-Stage Fracture 3271.50 3286.00 0
2018-05-16 Multi-Stage Fracture 2813.70 2813.80 0
2018-05-16 Multi-Stage Fracture 2759.30 2759.40 0
2018-05-16 Multi-Stage Fracture 2704.80 2704.90 0
2018-05-16 Multi-Stage Fracture 2650.40 2650.50 0
2018-05-16 Multi-Stage Fracture 2596.00 2596.10 0
2018-05-16 Multi-Stage Fracture 2540.90 2541.00 0
2018-05-16 Multi-Stage Fracture 2486.10 2486.20 0
2018-05-16 Multi-Stage Fracture 2433.10 2433.20 0
2018-05-16 Multi-Stage Fracture 2381.30 2381.40 0
2018-05-16 Multi-Stage Fracture 2326.60 2326.70 0
2018-05-15 Multi-Stage Fracture 3239.30 3239.40 0
2018-05-16 Multi-Stage Fracture 2273.10 2273.20 0
2018-05-15 Multi-Stage Fracture 3198.10 3198.20 0
2018-05-16 Multi-Stage Fracture 3142.60 3142.70 0
2018-05-16 Multi-Stage Fracture 3087.80 3087.90 0
2018-05-16 Multi-Stage Fracture 3032.30 3032.40 0
2018-05-16 Multi-Stage Fracture 2979.10 2979.20 0
2018-05-16 Multi-Stage Fracture 2924.10 2924.20 0
2018-05-16 Multi-Stage Fracture 2868.70 2868.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-05-15 2018-05-16 1,985 1,007 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 31.7108 N/A
water Not Available 100 41.047 N/A
ProLite (20/40) Trican amorphous silicon dioxide 7631-86-9 100 4.264 N/A
mullite 1302-93-8 100 4.264 N/A
silica crystalline-cristobalite 14464-46-1 100 4.264 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 21.4353 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.6133 N/A
Chemcide PT Trican Bactericide/Biocide methanol 67-56-1 100 0.0047 N/A
N-coco alkyltrimethylenediamine acetates 61791-64-8 100 0.0047 N/A
WBO-1 Trican Breaker ammonium persulfate 7727-54-0 100 0.0032 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.0484 N/A
non-hazardous ingredients Not Available 100 0.0484 N/A
CAN-1300 Dispersant / Foamer Trican Foamer cocoamidopropylhydroxysultaine 68139-30-0 100 0.2263 N/A
water Not Available 100 0.2263 N/A
WG-111LA Trican Gelling Agent fumaric acid 110-17-8 100 0.2697 N/A
guar gum 9000-30-0 100 0.2697 N/A
solvent naphtha (petroleum). heavy aliphatic 64742-96-7 100 0.2697 N/A
S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0222 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0222 N/A
methanol 67-56-1 100 0.0222 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0222 N/A
non-hazardous ingredients Not Available 100 0.0222 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-05-15 2018-05-16 Surface Water - Runoff 1007

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 5074 0.0 0.0 0.0
2019 8085 0.0 0.0 0.0
2020 2001 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-05-08 No Incident Encountered 0.00 0.00
2018-05-29 No Incident Encountered 0.00 0.00

For data sources see[10]

References