X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0756082606000

Well Details

Well ID: 0756082606000
Loading map...
Location: 00/06-26-075-08W6/0
Location Alias: 00/06-26-75-08 W6M
Location Alias 2: 00/06-26-075-08 W6/00
Country: Canada
Province: Alberta
Township: 075
Meridian: 6
Range: 08
Section: 26
County/Municipality: Saddle Hills County
Well Name: TIDEWATER VALHALLA 6-26-75-8
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0113376
License Date: 1985-02-14
License Status: Suspension
Spud Date: 1985-05-21
Final Drill Date: 1985-05-24
Well Total Depth: 790.00 m
Surface Hole Latitude: 55.526277
Surface Hole Longitude: -119.126162

For data sources see[1][2]

Well History

Date Event
1985-02-14 Obtained License
1985-05-21 Surface Casing Operation Performed
1985-05-24 Finished Drilling
1985-05-24 Well Log Performed
1985-05-25 Production Casing Operation Performed
1985-05-25 Rig Released
1985-07-23 Perforation Treatment Performed - Jet Perforation
1985-07-24 Perforation Treatment Performed - Jet Perforation
1985-07-24 Well Log Performed
1985-07-26 Perforation Treatment Performed - Fractured
1985-08-01 Well Mode changed to Drilled and Cased
1995-02-25 Well Log Performed
1995-05-05 Perforation Treatment Performed - Jet Perforation
1995-05-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-05-06 Perforation Treatment Performed - Jet Perforation
1995-05-08 Perforation Treatment Performed - Fractured
1995-06-01 Well Began Production
1995-06-01 Well Fluid changed to Crude Oil
1995-06-01 Well Mode changed to Flowing
1995-10-30 Well Fluid changed to Crude Oil
1995-10-30 Well Mode changed to Suspended
1996-09-25 Well Fluid changed to Crude Oil
1996-09-25 Well Mode changed to Pumping
1999-06-14 Well Fluid changed to Crude Oil
1999-06-14 Well Mode changed to Suspended
2003-12-17 Well Log Performed
2017-07-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-07-17 Perforation Treatment Performed - Cement Plug
2017-07-17 Plug Back Performed
2017-07-17 Well Fluid changed to Crude Oil
2017-07-17 Well Log Performed
2017-07-17 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-07-23 Perforation 733.50 735.50 13
2017-07-17 Packing Device Capped w/Cement 713.80 721.80 0
1985-07-24 Perforation 731.50 732.50 13
1985-07-26 Fracture 731.50 735.50 0
1995-05-05 Perforation 756.00 756.30 13
1995-05-06 Packing Device Capped w/Cement 745.40 749.40 0
1995-05-06 Perforation 731.50 732.50 13
1995-05-06 Perforation 733.50 735.50 13
1995-05-08 Fracture 731.50 735.50 0
2017-07-17 Cement Plug 740.40 745.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 2882 0.0 0.0 0.0
1996 760 0.0 0.0 0.0
1997 1201 0.0 0.0 0.0
1998 984 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-07-19 No Incident Encountered 0.00 0.00

For data sources see[6]

References