X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0756081813020

Well Details

Well ID: 0756081813020
Loading map...
Location: 02/13-18-075-08W6/0
Location Alias: 02/13-18-75-08 W6M
Location Alias 2: 02/13-18-075-08 W6/00
Country: Canada
Province: Alberta
Township: 075
Meridian: 6
Range: 08
Section: 18
County/Municipality: County of Grande Prairie No. 1
Well Name: SURGE ENERGY 102 VALHALLA 13-18-75-8
Operator Name: Surge Energy Inc.
License Number: 0494065
License Date: 2019-03-29
License Status: Amended
Spud Date: 2019-05-19
Final Drill Date: 2019-06-11
Well Total Depth: 4499.00 m
Surface Hole Latitude: 55.480006
Surface Hole Longitude: -119.234725

For data sources see[1][2]

Well History

Date Event
2019-03-29 Obtained License
2019-05-19 Drill To LD
2019-05-20 Surface Casing Operation Performed
2019-05-23 Direction Drilling Operation Performed - Deviate
2019-05-27 Direction Drilling Operation Performed - Horizontal
2019-05-27 Well Log Performed
2019-05-28 Intermediate Casing Operation Performed
2019-06-11 Finished Drilling
2019-06-11 Well Log Performed
2019-06-11 Well Mode changed to Drilled and Cased
2019-06-15 Production Casing Operation Performed
2019-06-17 Rig Released
2019-06-23 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-24 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-25 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-25 Well Began Production
2019-06-25 Well Fluid changed to Crude Oil
2019-06-25 Well Mode changed to Flowing
2019-10-01 Well Fluid changed to Crude Oil
2019-10-01 Well Mode changed to Gas Lift

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-05-19 Star Valley Drilling Ltd. 202 Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-05-23 1683.90 Deviate (5 - 79 degrees)
2019-05-27 2085.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-06-23 Multi-Stage Fracture 4460.00 4473.60 0
2019-06-24 Multi-Stage Fracture 3563.80 3563.90 0
2019-06-24 Multi-Stage Fracture 3510.00 3510.10 0
2019-06-24 Multi-Stage Fracture 3442.80 3442.90 0
2019-06-24 Multi-Stage Fracture 3391.10 3391.20 0
2019-06-24 Multi-Stage Fracture 3335.60 3335.70 0
2019-06-24 Multi-Stage Fracture 3216.50 3216.60 0
2019-06-24 Multi-Stage Fracture 3163.90 3164.00 0
2019-06-24 Multi-Stage Fracture 3110.60 3110.70 0
2019-06-24 Multi-Stage Fracture 3041.00 3041.10 0
2019-06-24 Multi-Stage Fracture 2960.10 2960.20 0
2019-06-23 Multi-Stage Fracture 4403.20 4403.30 0
2019-06-24 Multi-Stage Fracture 2856.60 2856.70 0
2019-06-24 Multi-Stage Fracture 2751.70 2751.80 0
2019-06-24 Multi-Stage Fracture 2648.60 2648.70 0
2019-06-24 Multi-Stage Fracture 2594.30 2594.40 0
2019-06-24 Multi-Stage Fracture 2516.00 2516.10 0
2019-06-25 Multi-Stage Fracture 2421.40 2421.50 0
2019-06-25 Multi-Stage Fracture 2318.70 2318.80 0
2019-06-25 Multi-Stage Fracture 2238.10 2238.20 0
2019-06-23 Multi-Stage Fracture 4250.00 4250.10 0
2019-06-23 Multi-Stage Fracture 4070.90 4071.00 0
2019-06-23 Multi-Stage Fracture 3963.70 3963.80 0
2019-06-23 Multi-Stage Fracture 3911.40 3911.50 0
2019-06-23 Multi-Stage Fracture 3836.80 3836.90 0
2019-06-24 Multi-Stage Fracture 3730.90 3731.00 0
2019-06-24 Multi-Stage Fracture 3628.00 3628.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-06-23 2019-06-25 1,968 1,480 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 33.0762 N/A
water Not Available 100 41.6833 N/A
Econo 20/40 Trican ceramic materials and wares. chemicals 66402-68-4 100 3.6658 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 19.6542 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.6566 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0099 N/A
dibromoacetonitrile 3252-43-5 100 0.0099 N/A
non-hazardous ingredients Not Available 100 0.0099 N/A
polyethylene glycol 25322-68-3 100 0.0099 N/A
sodium bromide 7647-15-6 100 0.0099 N/A
WBO-1 Trican Breaker ammonium persulfate 7727-54-0 100 0.0029 N/A
CC-10 Trican Clay Control non-hazardous ingredients Not Available 100 0.0206 N/A
WF-3 Trican Foamer cocamidopropyl betaine 61789-40-0 100 0.218 N/A
non-hazardous ingredients Not Available 100 0.218 N/A
potassium formate 590-29-4 100 0.218 N/A
WG-111LSA Trican Gelling Agent non-hazardous ingredients Not Available 100 0.1647 N/A
SI-18 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0121 N/A
S-28 Trican Surfactant methanol 67-56-1 100 0.0197 N/A
non-hazardous ingredients Not Available 100 0.0197 N/A
solvent naphtha (petroleum). heavy aromatic 64742-94-5 100 0.0198 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-06-21 2019-06-24 Surface Water - Runoff 1480

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 4248 0.0 0.0 0.0
2020 2127 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-06-18 No Incident Encountered 0.00 0.00
2019-06-25 No Incident Encountered 0.00 0.00

For data sources see[10]

References