X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0756062715000

Well Details

Well ID: 0756062715000
Loading map...
Location: 00/15-27-075-06W6/0
Location Alias: 00/15-27-75-06 W6M
Location Alias 2: 00/15-27-075-06 W6/00
Country: Canada
Province: Alberta
Township: 075
Meridian: 6
Range: 06
Section: 27
County/Municipality: Saddle Hills County
Well Name: CNRL HZ SADDLE 15-27-75-6
Operator Name: Canadian Natural Resources Limited
License Number: 0442700
License Date: 2012-01-11
License Status: Amended
Spud Date: 2012-03-05
Final Drill Date: 2012-03-22
Well Total Depth: 4372.00 m
Surface Hole Latitude: 55.531668
Surface Hole Longitude: -118.797157

For data sources see[1][2]

Well History

Date Event
2012-01-11 Obtained License
2012-03-06 Surface Casing Operation Performed
2012-03-08 Well Log Performed
2012-03-09 Direction Drilling Operation Performed - Deviate
2012-03-11 Direction Drilling Operation Performed - Horizontal
2012-03-11 Well Log Performed
2012-03-22 Finished Drilling
2012-03-22 Well Log Performed
2012-03-22 Well Mode changed to Drilled and Cased
2012-03-23 Well Log Performed
2012-03-25 Production Casing Operation Performed
2012-03-25 Rig Released
2012-04-17 Well Log Performed
2012-07-01 Perforation Treatment Performed - Abrasa-Jet Perforation
2012-07-01 Perforation Treatment Performed - Fractured
2012-07-02 Perforation Treatment Performed - Abrasa-Jet Perforation
2012-07-02 Perforation Treatment Performed - Fractured
2012-07-02 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-03 Perforation Treatment Performed - Abrasa-Jet Perforation
2012-07-03 Perforation Treatment Performed - Fractured
2012-07-03 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-04 Perforation Treatment Performed - Abrasa-Jet Perforation
2012-07-04 Perforation Treatment Performed - Fractured
2012-07-04 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-05 Perforation Treatment Performed - Abrasa-Jet Perforation
2012-07-05 Perforation Treatment Performed - Fractured
2012-07-05 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-01 Well Began Production
2012-08-01 Well Fluid changed to Crude Oil
2012-08-01 Well Mode changed to Pumping
2016-10-01 Well Fluid changed to Crude Oil
2016-10-01 Well Mode changed to Gas Lift

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-03-05 Ensign Drilling Inc. 127 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-03-09 1439.00 Deviate (5 - 79 degrees)
2012-03-11 1885.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-07-01 Hydra Jet Perforation 4303.00 4303.10 0
2012-07-02 Multi-Stage Fracture 4004.70 4004.80 0
2012-07-02 Multi-Stage Fracture 3920.00 3920.10 0
2012-07-02 Multi-Stage Fracture 3835.50 3835.60 0
2012-07-02 Multi-Stage Fracture 3751.30 3751.40 0
2012-07-02 Multi-Stage Fracture 3668.30 3668.40 0
2012-07-02 Multi-Stage Fracture 3588.60 3588.70 0
2012-07-02 Hydra Jet Perforation 3577.00 3577.10 0
2012-07-02 Fracture 3577.00 3577.10 0
2012-07-03 Multi-Stage Fracture 3505.90 3506.00 0
2012-07-03 Multi-Stage Fracture 3424.20 3424.30 0
2012-07-01 Fracture 4303.00 4303.10 0
2012-07-03 Multi-Stage Fracture 3337.60 3337.70 0
2012-07-03 Multi-Stage Fracture 3329.00 3329.10 0
2012-07-03 Multi-Stage Fracture 3258.90 3259.00 0
2012-07-03 Multi-Stage Fracture 3173.70 3173.80 0
2012-07-03 Hydra Jet Perforation 3168.00 3168.10 0
2012-07-03 Fracture 3168.00 3168.10 0
2012-07-03 Multi-Stage Fracture 3090.30 3090.40 0
2012-07-03 Multi-Stage Fracture 3006.20 3006.30 0
2012-07-03 Hydra Jet Perforation 2994.00 2994.10 0
2012-07-03 Fracture 2994.00 2994.10 0
2012-07-02 Hydra Jet Perforation 4258.10 4258.20 0
2012-07-03 Multi-Stage Fracture 2924.60 2924.70 0
2012-07-04 Hydra Jet Perforation 2902.00 2902.10 0
2012-07-04 Fracture 2902.00 2902.10 0
2012-07-04 Multi-Stage Fracture 2839.50 2839.60 0
2012-07-04 Multi-Stage Fracture 2757.30 2757.40 0
2012-07-04 Multi-Stage Fracture 2673.90 2674.00 0
2012-07-04 Hydra Jet Perforation 2662.80 2662.90 0
2012-07-04 Fracture 2662.80 2662.90 0
2012-07-04 Multi-Stage Fracture 2589.00 2589.10 0
2012-07-04 Multi-Stage Fracture 2503.90 2504.00 0
2012-07-02 Fracture 4258.10 4258.20 0
2012-07-04 Multi-Stage Fracture 2419.60 2419.70 0
2012-07-04 Multi-Stage Fracture 2334.70 2334.80 0
2012-07-04 Multi-Stage Fracture 2249.90 2250.00 0
2012-07-04 Multi-Stage Fracture 2170.40 2170.50 0
2012-07-04 Multi-Stage Fracture 2088.60 2088.70 0
2012-07-04 Multi-Stage Fracture 2004.70 2004.80 0
2012-07-05 Multi-Stage Fracture 1919.90 1920.00 0
2012-07-05 Hydra Jet Perforation 1907.60 1907.70 0
2012-07-05 Fracture 1907.60 1907.70 0
2012-07-02 Multi-Stage Fracture 4254.70 4254.80 0
2012-07-02 Multi-Stage Fracture 4169.70 4169.80 0
2012-07-02 Hydra Jet Perforation 4152.00 4152.10 0
2012-07-02 Fracture 4152.00 4152.10 0
2012-07-02 Multi-Stage Fracture 4089.70 4089.80 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 3123 0.0 0.0 0.0
2013 7189 0.0 0.0 0.0
2014 7452 0.0 0.0 0.0
2015 7961 0.0 0.0 0.0
2016 8468 0.0 0.0 0.0
2017 8403 0.0 0.0 0.0
2018 8673 0.0 0.0 0.0
2019 8702 0.0 0.0 0.0
2020 2132 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-25 No Incident Encountered 0.00 0.00
2012-07-14 No Incident Encountered 0.00 0.00

For data sources see[8]

References