If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0756062710000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.531308,"lon":-118.79714,"icon":""}]} |
Location: 00/10-27-075-06W6/0 | |
Location Alias: 00/10-27-75-06 W6M | |
Location Alias 2: 00/10-27-075-06 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 075 | |
Meridian: 6 | |
Range: 06 | |
Section: 27 | |
County/Municipality: Saddle Hills County | |
Well Name: CNRL HZ SADDLE 10-27-75-6 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0442699 | |
License Date: 2012-01-11 | |
License Status: Amended | |
Spud Date: 2012-04-07 | |
Final Drill Date: 2012-04-23 | |
Well Total Depth: 4427.00 m | |
Surface Hole Latitude: 55.531308 | |
Surface Hole Longitude: -118.797140 |
Date | Event |
---|---|
2012-01-11 | Obtained License |
2012-04-07 | Well Log Performed |
2012-04-08 | Surface Casing Operation Performed |
2012-04-10 | Direction Drilling Operation Performed - Deviate |
2012-04-12 | Direction Drilling Operation Performed - Horizontal |
2012-04-23 | Finished Drilling |
2012-04-23 | Well Log Performed |
2012-04-23 | Well Mode changed to Drilled and Cased |
2012-04-26 | Production Casing Operation Performed |
2012-04-26 | Rig Released |
2012-05-14 | Well Log Performed |
2012-06-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-06-25 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2012-06-25 | Perforation Treatment Performed - Fractured |
2012-06-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-06-26 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2012-06-26 | Perforation Treatment Performed - Fractured |
2012-06-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-06-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-06-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-01 | Well Began Production |
2012-08-01 | Well Fluid changed to Crude Oil |
2012-08-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-04-07 | Ensign Drilling Inc. | 127 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-04-10 | 1475.00 | Deviate (5 - 79 degrees) |
2012-04-12 | 1886.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-06-24 | Multi-Stage Fracture | 4394.00 | 4394.10 | 0 |
2012-06-26 | Hydra Jet Perforation | 3772.00 | 3772.10 | 0 |
2012-06-26 | Fracture | 3772.00 | 3772.10 | 0 |
2012-06-26 | Multi-Stage Fracture | 3693.70 | 3693.80 | 0 |
2012-06-26 | Hydra Jet Perforation | 3594.00 | 3594.10 | 0 |
2012-06-26 | Fracture | 3594.00 | 3594.10 | 0 |
2012-06-26 | Multi-Stage Fracture | 3520.90 | 3521.00 | 0 |
2012-06-26 | Multi-Stage Fracture | 3433.60 | 3433.70 | 0 |
2012-06-27 | Multi-Stage Fracture | 3344.90 | 3345.00 | 0 |
2012-06-27 | Multi-Stage Fracture | 3255.70 | 3255.80 | 0 |
2012-06-27 | Multi-Stage Fracture | 3167.70 | 3167.80 | 0 |
2012-06-25 | Multi-Stage Fracture | 4305.70 | 4305.80 | 0 |
2012-06-27 | Multi-Stage Fracture | 3079.40 | 3079.50 | 0 |
2012-06-28 | Multi-Stage Fracture | 2459.00 | 2459.10 | 0 |
2012-06-28 | Multi-Stage Fracture | 2372.30 | 2372.40 | 0 |
2012-06-28 | Multi-Stage Fracture | 2281.80 | 2281.90 | 0 |
2012-06-28 | Multi-Stage Fracture | 2193.10 | 2193.20 | 0 |
2012-06-28 | Multi-Stage Fracture | 2108.00 | 2108.10 | 0 |
2012-06-28 | Multi-Stage Fracture | 2020.60 | 2020.70 | 0 |
2012-06-28 | Multi-Stage Fracture | 1932.70 | 1932.80 | 0 |
2012-06-25 | Multi-Stage Fracture | 4219.50 | 4219.60 | 0 |
2012-06-25 | Multi-Stage Fracture | 4132.10 | 4132.20 | 0 |
2012-06-25 | Hydra Jet Perforation | 4034.00 | 4034.10 | 0 |
2012-06-25 | Fracture | 4034.00 | 4034.10 | 0 |
2012-06-26 | Hydra Jet Perforation | 3952.80 | 3952.90 | 0 |
2012-06-26 | Fracture | 3952.80 | 3952.90 | 0 |
2012-06-26 | Multi-Stage Fracture | 3873.30 | 3873.40 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 3376 | 0.0 | 0.0 | 0.0 |
2013 | 8300 | 0.0 | 0.0 | 0.0 |
2014 | 8125 | 0.0 | 0.0 | 0.0 |
2015 | 8307 | 0.0 | 0.0 | 0.0 |
2016 | 7855 | 0.0 | 0.0 | 0.0 |
2017 | 8293 | 0.0 | 0.0 | 0.0 |
2018 | 8594 | 0.0 | 0.0 | 0.0 |
2019 | 8651 | 0.0 | 0.0 | 0.0 |
2020 | 2135 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-04-26 | No Incident Encountered | 0.00 | 0.00 |
2012-07-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]