X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0756042906003

Well Details

Well ID: 0756042906003
Loading map...
Location: 00/06-29-075-04W6/3
Location Alias: 00/06-29-75-04 W6M
Location Alias 2: 00/06-29-075-04 W6/03
Country: Canada
Province: Alberta
Township: 075
Meridian: 6
Range: 04
Section: 29
County/Municipality: Birch Hills County
Well Name: CNRL ET AL WOKING 6-29-75-4
Operator Name: Canadian Natural Resources Limited
License Number: 0095626
License Date: 1982-03-22
License Status: Abandoned
Spud Date: 1982-03-25
Final Drill Date: 1982-04-17
Well Total Depth: 2101.00 m
Surface Hole Latitude: 55.525458
Surface Hole Longitude: -118.587159

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-03-22 Obtained License
1982-03-26 Lost Circulation Occurred
1982-04-02 Drill Stem Test Performed
1982-04-17 Finished Drilling
1982-04-17 Well Mode changed to Drilled and Cased
1982-04-19 Drill Stem Test Performed
1982-04-21 Drill Stem Test Performed
1982-04-22 Drill Stem Test Performed
1982-04-23 Production Casing Operation Performed
1982-05-31 Perforation Treatment Performed - Jet Perforation
1982-06-07 Perforation Treatment Performed - Acid Wash - No Pressure
1982-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-12-15 Perforation Treatment Performed - Jet Perforation
1988-02-13 Well Log Performed
1988-02-14 Perforation Treatment Performed - Jet Perforation
1988-11-17 Well Log Performed
1988-11-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-11-18 Perforation Treatment Performed - Jet Perforation
1988-11-18 Plug Back Performed
1988-12-22 Well Began Production
1988-12-22 Well Fluid changed to Gas
1988-12-22 Well Mode changed to Flowing
1992-04-30 Well Fluid changed to Gas
1992-04-30 Well Mode changed to Suspended
1992-05-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-05-30 Plug Back Performed
1992-05-30 Well Fluid changed to Gas
1992-05-30 Well Log Performed
1992-05-30 Well Mode changed to Abandoned Zone
1992-05-31 Perforation Treatment Performed - Jet Perforation
1992-05-31 Well Log Performed
1992-06-01 Perforation Treatment Performed - Jet Perforation
1993-03-03 Perforation Treatment Performed - Jet Perforation
1993-03-07 Perforation Treatment Performed - Jet Perforation
1993-03-07 Well Log Performed
1993-03-09 Perforation Treatment Performed - Cement Squeeze
1993-03-10 Well Log Performed
1993-03-11 Perforation Treatment Performed - Jet Perforation
1993-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-03-13 Well Log Performed
1993-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-03-14 Perforation Treatment Performed - Cement Squeeze
1993-03-14 Well Log Performed
1993-03-15 Perforation Treatment Performed - Cement Squeeze
1993-03-15 Well Log Performed
1993-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-03-16 Perforation Treatment Performed - Cement Squeeze
1993-03-16 Plug Back Performed
1994-03-31 Well Log Performed
1994-04-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-04-01 Plug Back Performed
1994-04-01 Well Abandoned
1994-04-02 Perforation Treatment Performed - Jet Perforation
1994-04-04 Well Log Performed
1994-04-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-05-31 Perforation 1990.80 1993.00 7
1992-06-01 Perforation 1396.00 1397.00 13
1993-03-03 Perforation 1465.00 1468.00 13
1993-03-07 Perforation 1570.50 1571.50 13
1993-03-07 Perforation 1572.00 1574.00 13
1993-03-09 Cement Squeeze 1570.50 1574.00 0
1993-03-11 Perforation 1570.00 1571.50 14
1993-03-12 Acid Treatment 1570.00 1571.50 0
1993-03-14 Acid Treatment 1465.00 1468.00 0
1993-03-14 Cement Squeeze 1465.00 1468.00 0
1993-03-15 Cement Squeeze 1405.00 1407.00 0
1982-06-07 Acid Wash 1990.80 1993.00 0
1993-03-16 Acid Treatment 1396.00 1397.00 0
1993-03-16 Cement Squeeze 1396.00 1397.00 0
1994-04-01 Packing Device Capped w/Cement 1555.00 1563.00 0
1994-04-02 Perforation 1355.00 1357.00 14
1994-04-05 Packing Device Capped w/Cement 1337.00 1345.00 0
1982-12-13 Packing Device Capped w/Cement 1972.00 1980.00 0
1982-12-15 Perforation 1572.00 1574.00 13
1988-02-14 Perforation 1570.50 1571.50 13
1988-11-18 Packing Device Capped w/Cement 1552.00 1560.00 0
1988-11-18 Perforation 1465.00 1468.00 13
1992-05-30 Packing Device Capped w/Cement 1447.00 1455.00 0
1992-05-31 Perforation 1405.00 1407.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 216 0.0 0.0 0.0
1989 4448 0.0 0.0 0.0
1990 4766 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1982-03-26 Lost Circulation 267.00 267.00

For data sources see[6]

References