If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0756042014000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.519043,"lon":-118.583014,"icon":""}]} |
Location: 00/14-20-075-04W6/0 | |
Location Alias: 00/14-20-75-04 W6M | |
Location Alias 2: 00/14-20-075-04 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 075 | |
Meridian: 6 | |
Range: 04 | |
Section: 20 | |
County/Municipality: Birch Hills County | |
Well Name: ANDERSON ET AL WOKING 14-20-75-4 | |
Operator Name: Devon Canada Corporation | |
License Number: 0101606 | |
License Date: 1983-06-07 | |
License Status: RecCertified | |
Spud Date: 1983-06-09 | |
Final Drill Date: 1983-06-22 | |
Well Total Depth: 1650.00 m | |
Surface Hole Latitude: 55.519043 | |
Surface Hole Longitude: -118.583014 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1983-06-07 | Obtained License |
1983-06-22 | Finished Drilling |
1983-06-23 | Well Log Performed |
1983-06-24 | Drill Stem Test Performed |
1983-06-25 | Drill Stem Test Performed |
1983-06-26 | Drill Stem Test Performed |
1983-06-27 | Drill Stem Test Performed |
1983-06-28 | Drill Stem Test Performed |
1983-06-29 | Production Casing Operation Performed |
1983-06-29 | Well Mode changed to Drilled and Cased |
1990-09-07 | Well Log Performed |
1990-09-08 | Perforation Treatment Performed - Jet Perforation |
1990-12-01 | Well Began Production |
1990-12-01 | Well Fluid changed to Gas |
1990-12-01 | Well Mode changed to Flowing |
1993-09-04 | Perforation Treatment Performed - Jet Perforation |
1993-09-04 | Well Log Performed |
1993-09-05 | Perforation Treatment Performed - Fractured |
1994-09-19 | Well Fluid changed to Gas |
1994-09-19 | Well Mode changed to Suspended |
2000-06-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-06-20 | Perforation Treatment Performed - Jet Perforation |
2000-06-20 | Plug Back Performed |
2000-06-20 | Well Log Performed |
2000-06-21 | Perforation Treatment Performed - Cement Plug |
2000-06-21 | Perforation Treatment Performed - Remedial Casing |
2000-06-23 | Well Abandoned |
2000-06-23 | Well Fluid changed to Gas |
2000-06-23 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-09-08 | Perforation | 1472.00 | 1474.00 | 13 |
1993-09-04 | Perforation | 1470.00 | 1474.00 | 13 |
1993-09-05 | Fracture | 1470.00 | 1474.00 | 0 |
2000-06-20 | Packing Device Capped w/Cement | 1452.00 | 1460.00 | 0 |
2000-06-20 | Perforation | 343.00 | 344.00 | 14 |
2000-06-21 | Remedial Casing Cementing | 343.00 | 344.00 | 0 |
2000-06-21 | Cement Plug | 320.00 | 359.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 721 | 0.0 | 0.0 | 0.0 |
1991 | 3128 | 0.0 | 0.0 | 0.0 |
1992 | 5020 | 0.0 | 0.0 | 0.0 |
1993 | 6461 | 0.0 | 0.0 | 0.0 |
1994 | 6007 | 0.0 | 0.0 | 0.0 |
For data sources see[5]