X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0756041714002

Well Details

Well ID: 0756041714002
Loading map...
Location: 00/14-17-075-04W6/2
Location Alias: 00/14-17-75-04 W6M
Location Alias 2: 00/14-17-075-04 W6/02
Country: Canada
Province: Alberta
Township: 075
Meridian: 6
Range: 04
Section: 17
County/Municipality: Birch Hills County
Well Name: ANDERSON WOKING 14-17-75-4
Operator Name: Devon Canada Corporation
License Number: 0163542
License Date: 1993-12-23
License Status: RecCertified
Spud Date: 1994-01-09
Final Drill Date: 1994-01-16
Well Total Depth: 1650.00 m
Surface Hole Latitude: 55.501996
Surface Hole Longitude: -118.583168

For data sources see[1][2]

Well History

Date Event
1993-12-23 Obtained License
1994-01-09 Well Log Performed
1994-01-10 Surface Casing Operation Performed
1994-01-13 Lost Circulation Occurred
1994-01-16 Finished Drilling
1994-01-16 Well Mode changed to Drilled and Cased
1994-01-18 Drill Stem Test Performed
1994-01-18 Well Log Performed
1994-01-19 Drill Stem Test Performed
1994-01-20 Drill Stem Test Performed
1994-01-21 Drill Stem Test Performed
1994-01-22 Drill Stem Test Performed
1994-01-24 Production Casing Operation Performed
1994-01-24 Rig Released
1994-06-24 Well Log Performed
1994-06-25 Perforation Treatment Performed - Jet Perforation
1994-10-01 Well Log Performed
1994-10-02 Perforation Treatment Performed - Jet Perforation
1995-05-30 Well Log Performed
1995-05-31 Perforation Treatment Performed - Jet Perforation
1995-08-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-08-04 Perforation Treatment Performed - Jet Perforation
1995-08-04 Plug Back Performed
1995-08-04 Well Log Performed
1995-08-05 Well Began Production
1995-08-05 Well Fluid changed to Gas
1995-08-05 Well Mode changed to Flowing
1996-03-22 Well Fluid changed to Gas
1996-03-22 Well Mode changed to Suspended
1998-05-20 Well Log Performed
1998-05-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-05-21 Plug Back Performed
1998-05-21 Well Fluid changed to Gas
1998-05-21 Well Log Performed
1998-05-21 Well Mode changed to Abandoned Zone
1998-05-24 Well Log Performed
1998-05-25 Well Log Performed
1998-05-26 Perforation Treatment Performed - Jet Perforation
1998-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-05-27 Well Log Performed
1998-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-05-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-05-29 Well Log Performed
1998-05-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-05-30 Perforation Treatment Performed - Jet Perforation
1998-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-05-31 Well Log Performed
1998-06-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-06-01 Well Log Performed
1998-06-02 Perforation Treatment Performed - Jet Perforation
1998-06-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-06-03 Well Log Performed
1998-06-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-06-16 Well Abandoned
1998-06-16 Well Fluid changed to Gas
1998-06-16 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-06-25 Perforation 1452.00 1456.00 13
1998-05-28 Acid Treatment 585.00 586.00 0
1998-05-28 Packing Device Capped w/Cement 565.10 577.00 0
1998-05-30 Perforation 374.00 375.00 13
1998-05-30 Acid Treatment 374.00 375.00 0
1998-05-31 Acid Treatment 374.00 375.00 0
1998-06-01 Packing Device Capped w/Cement 361.50 370.00 0
1998-06-02 Perforation 327.00 328.00 13
1998-06-03 Acid Treatment 327.00 328.00 0
1998-06-04 Packing Device Capped w/Cement 314.20 325.00 0
1994-10-02 Perforation 1452.00 1461.00 18
1995-05-31 Perforation 1468.00 1470.00 18
1995-08-04 Packing Device Capped w/Cement 1459.00 1467.00 0
1995-08-04 Packing Device Capped w/Cement 1442.00 1450.00 0
1995-08-04 Perforation 1080.00 1083.00 14
1998-05-21 Packing Device Capped w/Cement 1062.10 1070.10 0
1998-05-26 Perforation 585.00 586.00 13
1998-05-27 Acid Treatment 585.00 586.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 3439 0.0 0.0 0.0
1996 503 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1994-01-13 Lost Circulation 878.00 1078.00

For data sources see[6]

References