If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0756020806002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.480118,"lon":-118.277359,"icon":""}]} |
Location: 00/06-08-075-02W6/2 | |
Location Alias: 00/06-08-75-02 W6M | |
Location Alias 2: 00/06-08-075-02 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 075 | |
Meridian: 6 | |
Range: 02 | |
Section: 08 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: GALLEON KAKUT 6-8-75-2 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0134359 | |
License Date: 1988-06-15 | |
License Status: Suspension | |
Spud Date: 1988-06-17 | |
Final Drill Date: 1988-06-23 | |
Well Total Depth: 1500.00 m | |
Surface Hole Latitude: 55.480118 | |
Surface Hole Longitude: -118.277359 |
Date | Event |
---|---|
1988-06-15 | Obtained License |
1988-06-18 | Surface Casing Operation Performed |
1988-06-21 | Well Log Performed |
1988-06-23 | Finished Drilling |
1988-06-23 | Well Log Performed |
1988-06-24 | Drill Stem Test Performed |
1988-06-26 | Production Casing Operation Performed |
1988-06-26 | Rig Released |
1988-08-07 | Well Log Performed |
1988-08-08 | Perforation Treatment Performed - Jet Perforation |
1988-08-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-08-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-08-31 | Perforation Treatment Performed - Fractured |
1993-06-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-06-20 | Plug Back Performed |
1993-06-21 | Well Log Performed |
1993-06-22 | Perforation Treatment Performed - Jet Perforation |
1993-06-22 | Well Log Performed |
1993-06-24 | Well Mode changed to Drilled and Cased |
1993-11-02 | Well Began Production |
1993-11-02 | Well Fluid changed to Gas |
1993-11-02 | Well Mode changed to Flowing |
1994-07-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-07-30 | Plug Back Performed |
1994-07-30 | Well Fluid changed to Gas |
1994-07-30 | Well Mode changed to Abandoned Zone |
1994-07-31 | Perforation Treatment Performed - Jet Perforation |
2007-11-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-11-26 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1988-08-08 | Perforation | 1467.00 | 1469.00 | 13 |
1988-08-10 | Acid Treatment | 1467.00 | 1469.00 | 0 |
1988-08-12 | Acid Treatment | 1467.00 | 1469.00 | 0 |
1988-08-31 | Fracture | 1467.00 | 1469.00 | 0 |
1993-06-20 | Packing Device Capped w/Cement | 1456.00 | 1464.00 | 0 |
1993-06-22 | Perforation | 1293.50 | 1297.00 | 18 |
1994-07-30 | Packing Device Capped w/Cement | 1282.00 | 1290.00 | 0 |
1994-07-31 | Perforation | 1268.50 | 1270.50 | 13 |
2007-11-26 | Packing Device Capped w/Cement | 1252.00 | 1260.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1993 | 1313 | 0.0 | 0.0 | 0.0 |
1994 | 4757 | 0.0 | 0.0 | 0.0 |
For data sources see[5]