X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0755203212000

Well Details

Well ID: 0755203212000
Loading map...
Location: 00/12-32-075-20W5/0
Location Alias: 00/12-32-75-20 W5M
Location Alias 2: 00/12-32-075-20 W5/00
Country: Canada
Province: Alberta
Township: 075
Meridian: 5
Range: 20
Section: 32
County/Municipality: Municipal District of Smoky River No. 130
Well Name: LONG RUN HZ GVILLEE 12-32-75-20
Operator Name: Long Run Exploration Ltd.
License Number: 0448722
License Date: 2012-09-26
License Status: Issued
Spud Date: 2012-10-10
Final Drill Date: 2012-10-18
Well Total Depth: 2574.00 m
Surface Hole Latitude: 55.545256
Surface Hole Longitude: -117.051871

For data sources see[1][2]

Well History

Date Event
2012-09-26 Obtained License
2012-10-10 Surface Casing Operation Performed
2012-10-12 Direction Drilling Operation Performed - Deviate
2012-10-13 Direction Drilling Operation Performed - Horizontal
2012-10-13 Well Log Performed
2012-10-14 Intermediate Casing Operation Performed
2012-10-14 Well Log Performed
2012-10-18 Finished Drilling
2012-10-18 Well Mode changed to Drilled and Cased
2012-10-19 Well Log Performed
2012-10-20 Liner Casing Operation Performed
2012-10-20 Rig Released
2012-10-29 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-30 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-14 Well Began Production
2012-11-14 Well Fluid changed to Crude Oil
2012-11-14 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-10-10 Trinidad Drilling Ltd. 24 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-10-12 687.20 Deviate (5 - 79 degrees)
2012-10-13 1188.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-10-29 Multi-Stage Fracture 2548.80 2548.90 0
2012-10-29 Multi-Stage Fracture 2099.00 2099.10 0
2012-10-29 Multi-Stage Fracture 2049.00 2049.10 0
2012-10-29 Multi-Stage Fracture 1999.00 1999.10 0
2012-10-30 Multi-Stage Fracture 1949.00 1949.10 0
2012-10-30 Multi-Stage Fracture 1905.00 1905.10 0
2012-10-30 Multi-Stage Fracture 1864.00 1864.10 0
2012-10-30 Multi-Stage Fracture 1802.00 1802.10 0
2012-10-30 Multi-Stage Fracture 1762.00 1762.10 0
2012-10-30 Multi-Stage Fracture 1712.00 1712.10 0
2012-10-30 Multi-Stage Fracture 1662.00 1662.10 0
2012-10-29 Multi-Stage Fracture 2499.00 2499.10 0
2012-10-30 Multi-Stage Fracture 1622.00 1622.10 0
2012-10-30 Multi-Stage Fracture 1582.00 1582.10 0
2012-10-30 Multi-Stage Fracture 1528.00 1528.10 0
2012-10-30 Multi-Stage Fracture 1478.00 1478.10 0
2012-10-30 Multi-Stage Fracture 1425.20 1425.30 0
2012-10-30 Multi-Stage Fracture 1378.00 1378.10 0
2012-10-29 Multi-Stage Fracture 2449.00 2449.10 0
2012-10-29 Multi-Stage Fracture 2399.00 2399.10 0
2012-10-29 Multi-Stage Fracture 2346.50 2346.60 0
2012-10-29 Multi-Stage Fracture 2299.00 2299.10 0
2012-10-29 Multi-Stage Fracture 2249.00 2249.10 0
2012-10-29 Multi-Stage Fracture 2199.00 2199.10 0
2012-10-29 Multi-Stage Fracture 2149.00 2149.10 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1126 0.0 0.0 0.0
2013 8275 0.0 0.0 0.0
2014 8668 0.0 0.0 0.0
2015 8538 0.0 0.0 0.0
2016 7944 0.0 0.0 0.0
2017 8454 0.0 0.0 0.0
2018 8715 0.0 0.0 0.0
2019 8635 0.0 0.0 0.0
2020 2158 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-20 No Incident Encountered 0.00 0.00
2012-11-04 No Incident Encountered 0.00 0.00

For data sources see[8]

References