If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0746080709020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.386582,"lon":-119.208119,"icon":""}]} |
Location: 02/09-07-074-08W6/0 | |
Location Alias: 02/09-07-74-08 W6M | |
Location Alias 2: 02/09-07-074-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 074 | |
Meridian: 6 | |
Range: 08 | |
Section: 07 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: SURGE ENERGY HZ VALHALLA 9-7-74-8 | |
Operator Name: Surge Energy Inc. | |
License Number: 0434493 | |
License Date: 2011-06-21 | |
License Status: Amended | |
Spud Date: 2011-07-08 | |
Final Drill Date: 2011-08-13 | |
Well Total Depth: 3040.00 m | |
Surface Hole Latitude: 55.386582 | |
Surface Hole Longitude: -119.208119 |
Date | Event |
---|---|
2011-06-21 | Obtained License |
2011-07-11 | Surface Casing Operation Performed |
2011-07-26 | Well Log Performed |
2011-07-27 | Direction Drilling Operation Performed - Horizontal |
2011-08-03 | Intermediate Casing Operation Performed |
2011-08-03 | Well Log Performed |
2011-08-04 | Well Log Performed |
2011-08-07 | Well Log Performed |
2011-08-13 | Finished Drilling |
2011-08-13 | Well Log Performed |
2011-08-13 | Well Mode changed to Drilled and Cased |
2011-08-15 | Liner Casing Operation Performed |
2011-08-16 | Perforation Treatment Performed - Open-Hole Completion |
2011-08-18 | Rig Released |
2011-09-03 | Perforation Treatment Performed - Jet Perforation |
2011-09-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-04 | Perforation Treatment Performed - Jet Perforation |
2011-09-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-05 | Perforation Treatment Performed - Jet Perforation |
2011-09-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-05 | Well Began Production |
2011-09-05 | Well Fluid changed to Crude Oil |
2011-09-05 | Well Mode changed to Pumping |
2011-09-08 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-07-27 | 1725.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-08-16 | Open Hole/Barefoot Completion | 3035.00 | 3040.00 | 0 |
2011-09-04 | Multi-Stage Fracture | 2605.00 | 2605.10 | 0 |
2011-09-04 | Perforation | 2510.00 | 2510.10 | 1 |
2011-09-04 | Multi-Stage Fracture | 2510.00 | 2510.10 | 0 |
2011-09-05 | Perforation | 2415.00 | 2415.10 | 1 |
2011-09-05 | Multi-Stage Fracture | 2415.00 | 2415.10 | 0 |
2011-09-05 | Perforation | 2330.00 | 2330.10 | 1 |
2011-09-05 | Multi-Stage Fracture | 2330.00 | 2330.10 | 0 |
2011-09-05 | Perforation | 2255.00 | 2255.10 | 1 |
2011-09-05 | Multi-Stage Fracture | 2255.00 | 2255.10 | 0 |
2011-09-03 | Multi-Stage Fracture | 2987.50 | 2987.60 | 0 |
2011-09-03 | Perforation | 2885.00 | 2885.10 | 1 |
2011-09-03 | Multi-Stage Fracture | 2885.00 | 2885.10 | 0 |
2011-09-04 | Perforation | 2795.00 | 2795.10 | 1 |
2011-09-04 | Multi-Stage Fracture | 2795.00 | 2795.10 | 0 |
2011-09-04 | Perforation | 2700.00 | 2700.10 | 1 |
2011-09-04 | Multi-Stage Fracture | 2700.00 | 2700.10 | 0 |
2011-09-04 | Perforation | 2605.00 | 2605.10 | 1 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 2573 | 0.0 | 0.0 | 0.0 |
2012 | 8051 | 0.0 | 0.0 | 0.0 |
2013 | 6718 | 0.0 | 0.0 | 0.0 |
2014 | 7493 | 0.0 | 0.0 | 0.0 |
2015 | 3528 | 0.0 | 0.0 | 0.0 |
2016 | 6704 | 0.0 | 0.0 | 0.0 |
2017 | 7187 | 0.0 | 0.0 | 0.0 |
2018 | 7281 | 0.0 | 0.0 | 0.0 |
2019 | 8495 | 0.0 | 0.0 | 0.0 |
2020 | 2178 | 0.0 | 0.0 | 0.0 |
For data sources see[6]