If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0745193512000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.456239,"lon":-116.820727,"icon":""}]} |
Location: 00/12-35-074-19W5/0 | |
Location Alias: 00/12-35-74-19 W5M | |
Location Alias 2: 00/12-35-074-19 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 074 | |
Meridian: 5 | |
Range: 19 | |
Section: 35 | |
County/Municipality: Municipal District of Smoky River No. 130 | |
Well Name: CPC SHADOW 12-35-74-19 | |
Operator Name: Lexin Resources Ltd. | |
License Number: 0139504 | |
License Date: 1989-04-05 | |
License Status: RecCertified | |
Spud Date: 1989-04-07 | |
Final Drill Date: 1989-04-30 | |
Well Total Depth: 2424.00 m | |
Surface Hole Latitude: 55.456239 | |
Surface Hole Longitude: -116.820727 |
Date | Event |
---|---|
1989-04-05 | Obtained License |
1989-04-09 | Surface Casing Operation Performed |
1989-04-11 | Blowout Occurred |
1989-04-30 | Finished Drilling |
1989-04-30 | Well Log Performed |
1989-04-30 | Well Mode changed to Drilled and Cased |
1989-05-03 | Production Casing Operation Performed |
1989-05-04 | Rig Released |
1989-05-17 | Perforation Treatment Performed - Jet Perforation |
1989-05-19 | Perforation Treatment Performed - Remedial Casing |
1989-05-30 | Perforation Treatment Performed - Jet Perforation |
1989-07-01 | Well Began Production |
1989-07-01 | Well Fluid changed to Crude Oil |
1989-07-01 | Well Mode changed to Pumping |
1990-07-15 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1992-05-10 | Well Log Performed |
1992-05-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-05-11 | Plug Back Performed |
1992-05-11 | Well Abandoned |
1992-05-11 | Well Fluid changed to Crude Oil |
1992-05-11 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1989-05-17 | Perforation | 1480.80 | 1481.40 | 8 |
1989-05-19 | Remedial Casing Cementing | 1480.80 | 1481.40 | 0 |
1989-05-30 | Perforation | 2369.00 | 2371.00 | 13 |
1990-07-15 | Hydra Jet Perforation | 2369.00 | 2373.00 | 0 |
1992-05-11 | Packing Device Capped w/Cement | 2342.00 | 2350.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1989 | 3525 | 0.0 | 0.0 | 0.0 |
1990 | 8270 | 0.0 | 0.0 | 0.0 |
1991 | 5757 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1989-04-11 | Blowout | 941.00 | 941.00 |
For data sources see[6]