If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0736051903020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.332945,"lon":-118.76537,"icon":""}]} |
Location: 02/03-19-073-05W6/0 | |
Location Alias: 02/03-19-73-05 W6M | |
Location Alias 2: 02/03-19-073-05 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 073 | |
Meridian: 6 | |
Range: 05 | |
Section: 19 | |
County/Municipality: Sexsmith | |
Well Name: PRED 02 CLAIR 3-19-73-5 | |
Operator Name: Firenze Energy Ltd. | |
License Number: 0283737 | |
License Date: 2003-02-28 | |
License Status: Suspension | |
Spud Date: 2003-03-13 | |
Final Drill Date: 2003-03-15 | |
Well Total Depth: 874.00 m | |
Surface Hole Latitude: 55.332945 | |
Surface Hole Longitude: -118.765370 |
Date | Event |
---|---|
2003-02-28 | Obtained License |
2003-03-13 | Direction Drilling Operation Performed - Deviate |
2003-03-14 | Surface Casing Operation Performed |
2003-03-15 | Finished Drilling |
2003-03-15 | Well Log Performed |
2003-03-15 | Well Mode changed to Drilled and Cased |
2003-03-16 | Production Casing Operation Performed |
2003-03-16 | Rig Released |
2003-03-17 | Perforation Treatment Performed - Jet Perforation |
2003-03-27 | Well Began Production |
2003-03-27 | Well Fluid changed to Crude Oil |
2003-03-27 | Well Mode changed to Flowing |
2012-01-26 | Well Fluid changed to Crude Oil |
2012-01-26 | Well Mode changed to Suspended |
2015-10-31 | Well Type changed to Observation |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2003-03-13 | 270.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2003-03-17 | Perforation | 830.50 | 832.00 | 17 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 3584 | 0.0 | 0.0 | 0.0 |
2004 | 8395 | 0.0 | 0.0 | 0.0 |
2005 | 8106 | 0.0 | 0.0 | 0.0 |
2006 | 8315 | 0.0 | 0.0 | 0.0 |
2008 | 144 | 0.0 | 0.0 | 0.0 |
For data sources see[6]