If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0736042606000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.350501,"lon":-118.503171,"icon":""}]} |
Location: 00/06-26-073-04W6/0 | |
Location Alias: 00/06-26-73-04 W6M | |
Location Alias 2: 00/06-26-073-04 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 073 | |
Meridian: 6 | |
Range: 04 | |
Section: 26 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: MOBIL-GC ET AL TEEPEE 6-26-73-4 | |
Operator Name: ExxonMobil Canada Ltd. | |
License Number: 0044623 | |
License Date: 1972-12-22 | |
License Status: RecCertified | |
Spud Date: 1972-12-31 | |
Final Drill Date: 1973-02-21 | |
Well Total Depth: 3313.20 m | |
Surface Hole Latitude: 55.350501 | |
Surface Hole Longitude: -118.503171 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1972-12-22 | Obtained License |
1973-01-14 | Drill Stem Test Performed |
1973-01-20 | Drill Stem Test Performed |
1973-01-20 | Lost Circulation Occurred |
1973-02-21 | Finished Drilling |
1973-02-23 | Drill Stem Test Performed |
1973-02-26 | Production Casing Operation Performed |
1973-09-14 | Well Mode changed to Drilled and Cased |
1976-02-26 | Perforation Treatment Performed - Jet Perforation |
1976-02-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-03-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-01-26 | Well Began Production |
1978-01-26 | Well Fluid changed to Gas |
1978-01-26 | Well Mode changed to Flowing |
1983-12-29 | Well Fluid changed to Gas |
1983-12-29 | Well Mode changed to Suspended |
1987-12-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-12-12 | Plug Back Performed |
1987-12-12 | Well Fluid changed to Gas |
1987-12-12 | Well Mode changed to Abandoned Zone |
1987-12-13 | Well Log Performed |
1987-12-14 | Perforation Treatment Performed - Jet Perforation |
1987-12-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-03-13 | Perforation Treatment Performed - Cement Squeeze |
1989-03-13 | Plug Back Performed |
1989-12-11 | Perforation Treatment Performed - Jet Perforation |
1989-12-11 | Perforation Treatment Performed - Remedial Casing |
1989-12-11 | Well Log Performed |
1989-12-13 | Perforation Treatment Performed - Jet Perforation |
1989-12-13 | Perforation Treatment Performed - Remedial Casing |
1989-12-14 | Well Abandoned |
1993-12-09 | Well Log Performed |
1993-12-10 | Perforation Treatment Performed - Jet Perforation |
1993-12-10 | Well Log Performed |
1993-12-11 | Perforation Treatment Performed - Jet Perforation |
1993-12-11 | Well Log Performed |
1993-12-12 | Perforation Treatment Performed - Cement Squeeze |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-02-26 | Perforation | 1942.20 | 1942.80 | 3 |
1989-12-11 | Remedial Casing Cementing | 425.00 | 425.10 | 0 |
1989-12-13 | Perforation | 245.00 | 245.00 | 13 |
1989-12-13 | Remedial Casing Cementing | 245.00 | 245.00 | 0 |
1993-12-10 | Perforation | 205.00 | 205.30 | 13 |
1993-12-10 | Perforation | 217.00 | 217.30 | 13 |
1993-12-11 | Perforation | 154.00 | 154.30 | 13 |
1993-12-11 | Perforation | 161.70 | 162.00 | 13 |
1993-12-12 | Cement Squeeze | 154.00 | 154.30 | 0 |
1976-02-26 | Perforation | 1945.20 | 1945.80 | 3 |
1976-02-27 | Acid Treatment | 1942.20 | 1945.80 | 0 |
1976-03-12 | Acid Treatment | 1942.20 | 1945.80 | 0 |
1987-12-12 | Packing Device Capped w/Cement | 1936.00 | 1938.00 | 0 |
1987-12-14 | Perforation | 1634.90 | 1636.50 | 13 |
1987-12-15 | Acid Treatment | 1634.90 | 1636.50 | 0 |
1989-03-13 | Cement Squeeze | 1634.90 | 1636.50 | 0 |
1989-12-11 | Perforation | 425.00 | 425.10 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1976 | 24 | 0.0 | 0.0 | 0.0 |
1978 | 810 | 0.0 | 0.0 | 0.0 |
1979 | 6313 | 0.0 | 0.0 | 0.0 |
1980 | 1891 | 0.0 | 0.0 | 0.0 |
1982 | 293 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1973-01-20 | Lost Circulation | 1959.30 | 1959.30 |
For data sources see[6]