If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0735040502000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.2893,"lon":-114.576749,"icon":""}]} |
Location: 00/02-05-073-04W5/0 | |
Location Alias: 00/02-05-73-04 W5M | |
Location Alias 2: 00/02-05-073-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 073 | |
Meridian: 5 | |
Range: 04 | |
Section: 05 | |
County/Municipality: Municipal District of Lesser Slave River No. 124 | |
Well Name: HOME ET AL MITSUE 2-5-73-4 | |
Operator Name: Devon Canada Corporation | |
License Number: 0123459 | |
License Date: 1986-07-14 | |
License Status: RecCertified | |
Spud Date: 1986-07-28 | |
Final Drill Date: 1986-08-21 | |
Well Total Depth: 1660.00 m | |
Surface Hole Latitude: 55.289300 | |
Surface Hole Longitude: -114.576749 |
Date | Event |
---|---|
1986-07-14 | Obtained License |
1986-07-30 | Surface Casing Operation Performed |
1986-08-01 | Kick Occurred |
1986-08-03 | Kick Occurred |
1986-08-03 | Lost Circulation Occurred |
1986-08-08 | Lost Circulation Occurred |
1986-08-09 | Kick Occurred |
1986-08-13 | Kick Occurred |
1986-08-16 | Intermediate Casing Operation Performed |
1986-08-21 | Finished Drilling |
1986-08-21 | Well Log Performed |
1986-08-21 | Well Mode changed to Drilled and Cased |
1986-08-22 | Liner Casing Operation Performed |
1986-08-24 | Rig Released |
1986-09-24 | Well Log Performed |
1986-09-26 | Perforation Treatment Performed - Jet Perforation |
1986-09-26 | Well Log Performed |
1986-10-04 | Well Began Production |
1986-10-04 | Well Fluid changed to Crude Oil |
1986-10-04 | Well Mode changed to Pumping |
1987-07-21 | Perforation Treatment Performed - Jet Perforation |
1987-07-21 | Well Log Performed |
1988-08-28 | Well Fluid changed to Crude Oil |
1988-08-28 | Well Mode changed to Suspended |
1993-05-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-05-27 | Plug Back Performed |
1993-05-27 | Well Log Performed |
1993-05-28 | Perforation Treatment Performed - Jet Perforation |
1993-05-29 | Perforation Treatment Performed - Remedial Casing |
1993-05-31 | Well Log Performed |
1993-06-04 | Perforation Treatment Performed - Jet Perforation |
1993-06-04 | Perforation Treatment Performed - Remedial Casing |
1993-06-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-06-05 | Well Abandoned |
1993-06-05 | Well Fluid changed to Crude Oil |
1993-06-05 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1986-09-26 | Perforation | 1629.10 | 1630.20 | 13 |
1993-06-05 | Packing Device Capped w/Cement | 247.00 | 255.00 | 0 |
1987-07-21 | Perforation | 1624.00 | 1625.50 | 13 |
1987-07-21 | Perforation | 1627.00 | 1628.60 | 13 |
1993-05-27 | Packing Device Capped w/Cement | 1610.00 | 1618.00 | 0 |
1993-05-28 | Perforation | 440.00 | 441.00 | 13 |
1993-05-28 | Perforation | 365.00 | 366.00 | 13 |
1993-05-29 | Remedial Casing Cementing | 365.00 | 441.00 | 0 |
1993-06-04 | Perforation | 262.00 | 263.00 | 13 |
1993-06-04 | Remedial Casing Cementing | 262.00 | 263.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1986 | 1527 | 0.0 | 0.0 | 0.0 |
1987 | 8120 | 0.0 | 0.0 | 0.0 |
1988 | 4558 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1986-08-01 | Kick | 437.00 | 437.00 |
1986-08-03 | Kick | 849.00 | 861.00 |
1986-08-08 | Lost Circulation | 1353.00 | 1391.00 |
1986-08-09 | Kick | 1491.50 | 1491.50 |
1986-08-03 | Lost Circulation | 861.00 | 861.00 |
1986-08-13 | Kick | 1630.00 | 1630.00 |
For data sources see[6]