If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0726120606000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.203663,"lon":-119.839427,"icon":""}]} |
Location: 00/06-06-072-12W6/0 | |
Location Alias: 00/06-06-72-12 W6M | |
Location Alias 2: 00/06-06-072-12 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 072 | |
Meridian: 6 | |
Range: 12 | |
Section: 06 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: ECA SINCLAIR 6-6-72-12 | |
Operator Name: Ovintiv Canada ULC | |
License Number: 0079911 | |
License Date: 1979-12-14 | |
License Status: RecCertified | |
Spud Date: 1979-12-27 | |
Final Drill Date: 1980-03-04 | |
Well Total Depth: 2942.00 m | |
Surface Hole Latitude: 55.203663 | |
Surface Hole Longitude: -119.839427 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-12-14 | Obtained License |
1980-01-16 | Drill Stem Test Performed |
1980-01-18 | Well Log Performed |
1980-01-26 | Drill Stem Test Performed |
1980-02-08 | Drill Stem Test Performed |
1980-03-04 | Finished Drilling |
1980-03-05 | Well Log Performed |
1980-03-10 | Production Casing Operation Performed |
1980-07-02 | Perforation Treatment Performed - Jet Perforation |
1980-07-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-07-05 | Perforation Treatment Performed - Fractured |
1980-07-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-07-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-07-10 | Perforation Treatment Performed - Jet Perforation |
1980-07-12 | Perforation Treatment Performed - Fractured |
1980-07-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-07-17 | Perforation Treatment Performed - Jet Perforation |
1980-07-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-07-19 | Perforation Treatment Performed - Fractured |
1980-07-25 | Perforation Treatment Performed - Fractured |
1980-08-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-08-02 | Perforation Treatment Performed - Jet Perforation |
1980-08-03 | Perforation Treatment Performed - Fractured |
1980-08-03 | Well Mode changed to Drilled and Cased |
1994-05-09 | Perforation Treatment Performed - Jet Perforation |
1994-05-12 | Perforation Treatment Performed - Jet Perforation |
1994-05-12 | Well Mode changed to Drilled and Cased |
1994-05-15 | Perforation Treatment Performed - Jet Perforation |
1994-05-15 | Well Log Performed |
1994-05-21 | Perforation Treatment Performed - Fractured |
1994-10-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-10-31 | Plug Back Performed |
1994-11-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-11-03 | Plug Back Performed |
1994-11-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-11-04 | Plug Back Performed |
1994-11-04 | Well Mode changed to Abandoned Zone |
1994-11-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-11-05 | Plug Back Performed |
1994-11-10 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-07-02 | Perforation | 2881.50 | 2885.00 | 12 |
1980-07-18 | Acid Treatment | 2208.00 | 2220.00 | 0 |
1980-07-19 | Fracture | 2208.00 | 2220.00 | 0 |
1980-07-25 | Fracture | 2208.00 | 2220.00 | 0 |
1980-08-02 | Perforation | 1856.00 | 1868.00 | 12 |
1980-08-02 | Acid Treatment | 1856.00 | 1868.00 | 0 |
1980-08-03 | Fracture | 1856.00 | 1868.00 | 0 |
1994-05-09 | Perforation | 2332.00 | 2338.00 | 12 |
1994-05-12 | Perforation | 2881.50 | 2885.00 | 12 |
1994-05-15 | Perforation | 2866.50 | 2874.00 | 13 |
1994-05-15 | Perforation | 2881.50 | 2885.00 | 13 |
1980-07-03 | Acid Treatment | 2881.50 | 2885.00 | 0 |
1994-05-21 | Fracture | 2866.50 | 2885.00 | 0 |
1994-10-31 | Packing Device Capped w/Cement | 2846.00 | 2854.00 | 0 |
1994-11-03 | Packing Device Capped w/Cement | 2330.00 | 2330.00 | 0 |
1994-11-04 | Packing Device Capped w/Cement | 2188.20 | 2196.20 | 0 |
1994-11-05 | Packing Device Capped w/Cement | 1835.90 | 1843.90 | 0 |
1980-07-05 | Fracture | 2881.50 | 2885.00 | 0 |
1980-07-09 | Packing Device Capped w/Cement | 2830.00 | 2867.00 | 0 |
1980-07-10 | Perforation | 2332.00 | 2338.00 | 12 |
1980-07-10 | Acid Treatment | 2332.00 | 2338.00 | 0 |
1980-07-12 | Fracture | 2332.00 | 2338.00 | 0 |
1980-07-16 | Packing Device Capped w/Cement | 2312.00 | 2320.00 | 0 |
1980-07-17 | Perforation | 2208.00 | 2220.00 | 12 |
For data sources see[4]