X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0726082512000

Well Details

Well ID: 0726082512000
Loading map...
Location: 00/12-25-072-08W6/0
Location Alias: 00/12-25-72-08 W6M
Location Alias 2: 00/12-25-072-08 W6/00
Country: Canada
Province: Alberta
Township: 072
Meridian: 6
Range: 08
Section: 25
County/Municipality: County of Grande Prairie No. 1
Well Name: AVN HZ WEMBLEY 12-25-72-8
Operator Name: Advantage Oil & Gas Ltd.
License Number: 0483962
License Date: 2017-06-12
License Status: Issued
Spud Date: 2017-07-20
Final Drill Date: 2017-08-04
Well Total Depth: 4705.00 m
Surface Hole Latitude: 55.288383
Surface Hole Longitude: -119.103768

For data sources see[1][2]

Well History

Date Event
2017-06-12 Obtained License
2017-07-22 Surface Casing Operation Performed
2017-07-25 Direction Drilling Operation Performed - Deviate
2017-07-25 Direction Drilling Operation Performed - Horizontal
2017-07-27 Well Log Performed
2017-08-03 Well Log Performed
2017-08-04 Finished Drilling
2017-08-04 Well Log Performed
2017-08-04 Well Mode changed to Drilled and Cased
2017-08-05 Production Casing Operation Performed
2017-08-06 Rig Released
2017-11-08 Perforation Treatment Performed - Open-Hole Completion
2017-11-09 Well Log Performed
2017-12-05 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-06 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-07 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-08 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-09 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-10 Perforation Treatment Performed - Multi-Stage Fracture
2019-09-23 Well Began Production
2019-09-23 Well Fluid changed to Gas
2019-09-23 Well Mode changed to Flowing
2019-10-01 Well Fluid changed to Gas
2019-10-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-07-20 Horizon Drilling Inc. 30 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-07-25 1884.00 Deviate (5 - 79 degrees)
2017-07-25 2287.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-11-08 Open Hole/Barefoot Completion 4691.00 4705.00 0
2017-12-06 Multi-Stage Fracture 4253.90 4254.00 0
2017-12-06 Multi-Stage Fracture 4201.30 4201.40 0
2017-12-06 Multi-Stage Fracture 4148.70 4148.80 0
2017-12-06 Multi-Stage Fracture 4096.00 4096.10 0
2017-12-06 Multi-Stage Fracture 4044.50 4044.60 0
2017-12-07 Multi-Stage Fracture 3991.80 3991.90 0
2017-12-07 Multi-Stage Fracture 3939.20 3939.30 0
2017-12-08 Multi-Stage Fracture 3887.50 3887.60 0
2017-12-08 Multi-Stage Fracture 3834.90 3835.00 0
2017-12-08 Multi-Stage Fracture 3782.30 3782.40 0
2017-12-05 Multi-Stage Fracture 4679.60 4679.70 0
2017-12-08 Multi-Stage Fracture 3717.00 3717.10 0
2017-12-08 Multi-Stage Fracture 3651.70 3651.80 0
2017-12-08 Multi-Stage Fracture 3586.50 3586.60 0
2017-12-08 Multi-Stage Fracture 3521.20 3521.30 0
2017-12-09 Multi-Stage Fracture 3455.90 3456.00 0
2017-12-09 Multi-Stage Fracture 3390.70 3390.80 0
2017-12-09 Multi-Stage Fracture 3325.80 3325.90 0
2017-12-09 Multi-Stage Fracture 3261.00 3261.10 0
2017-12-09 Multi-Stage Fracture 3195.70 3195.80 0
2017-12-09 Multi-Stage Fracture 3130.40 3130.50 0
2017-12-05 Multi-Stage Fracture 4620.10 4620.20 0
2017-12-09 Multi-Stage Fracture 3065.10 3065.20 0
2017-12-09 Multi-Stage Fracture 3000.30 3000.40 0
2017-12-09 Multi-Stage Fracture 2935.00 2935.10 0
2017-12-10 Multi-Stage Fracture 2869.80 2869.90 0
2017-12-10 Multi-Stage Fracture 2804.50 2804.60 0
2017-12-10 Multi-Stage Fracture 2739.20 2739.30 0
2017-12-10 Multi-Stage Fracture 2674.00 2674.10 0
2017-12-10 Multi-Stage Fracture 2609.50 2609.60 0
2017-12-10 Multi-Stage Fracture 2544.30 2544.40 0
2017-12-10 Multi-Stage Fracture 2479.00 2479.10 0
2017-12-05 Multi-Stage Fracture 4567.80 4567.90 0
2017-12-05 Multi-Stage Fracture 4515.20 4515.30 0
2017-12-05 Multi-Stage Fracture 4463.00 4463.10 0
2017-12-06 Multi-Stage Fracture 4410.40 4410.50 0
2017-12-06 Multi-Stage Fracture 4358.10 4358.20 0
2017-12-06 Multi-Stage Fracture 4306.50 4306.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-12-05 2017-12-10 2,222 12,543 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 81.0502 N/A
Sand - Tier 1 (30/50) Trican Well Service Aluminum Oxide 1344-28-1 100 9.9479 N/A
Crystalline silica. quartz 14808-60-7 100 9.9479 N/A
Iron Oxide 1309-37-1 100 9.9479 N/A
Titanium Oxide 13463-67-7 100 9.9479 N/A
Sand - Tier 1 (40/70) Trican Well Service Aluminum Oxide 1344-28-1 100 5.0019 N/A
Crystalline silica. quartz 14808-60-7 100 5.0019 N/A
Iron Oxide 1309-37-1 100 5.0019 N/A
Titanium Oxide 13463-67-7 100 5.002 N/A
AQUCAR DB20 Biocide Trican Well Service Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0104 N/A
2-mercaptoethanol 60-24-2 100 0.0104 N/A
dibromoacetonitrile 3252-43-5 100 0.0104 N/A
non-hazardous ingredients Not Available 100 0.0104 N/A
sodium bromide 7647-15-6 100 0.0104 N/A
EnCap-HP (Breaker Encapsulated Oxidizer) Trican Well Service Breaker ammonium persulfate 7727-54-0 100 0.0016 N/A
cured acrylic resin Not Available 100 0.0016 N/A
silica crystalline 14808-60-7 100 0.0016 N/A
CAN-2102 pH Buffer (HpH) Trican Well Service Buffer Methyl Alcohol 67-56-1 100 0.0174 N/A
Sodium Hydroxide 1310-73-2 100 0.0174 N/A
Water 7732-18-5 100 0.0174 N/A
CC-8 Clay Stabilizer Trican Well Service Clay Control choline chloride 67-48-1 100 0.1821 N/A
non-hazardous ingredients Not Available 100 0.1821 N/A
CAN-2200 Crosslinker / pH buffer (Borate) Trican Well Service Crosslinker Boric Acid 10043-35-3 100 0.0165 N/A
Monoethanolamine 141-43-5 100 0.0165 N/A
Water 7732-18-5 100 0.0165 N/A
Nitrogen Gas Trican Well Service Energizing Fluid Nitrogen 7727-37-9 100 3.5861 N/A
Non-hazardous base ingredient(s) Not Available 100 3.5861 N/A
CAN-2057 Friction Reducer Trican Well Service Gelling Agent No hazardous ingredients Not Available 100 0.0653 N/A
WG-111LA (Rapid Gellant. Buffered) Trican Well Service Gelling Agent fumaric acid 110-17-8 100 0.033 N/A
guar gum 9000-30-0 100 0.033 N/A
solvent naphtha (petroleum). heavy aliphatic 64742-96-7 100 0.033 N/A
nanoFLO 2 Trican Well Service Surfactant Refer to MSDS 1097 100 0.087 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-11-08 2017-11-08 Central Water Distribution Facility 35
2017-11-10 2017-11-25 Central Water Distribution Facility 1395
2017-11-27 2017-12-10 Surface Water - Lake 12528

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 1051 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-07-25 No Incident Encountered 0.00 0.00
2017-12-10 No Incident Encountered 0.00 0.00

For data sources see[10]

References