X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0725052116000

Well Details

Well ID: 0725052116000
Loading map...
Location: 00/16-21-072-05W5/0
Location Alias: 00/16-21-72-05 W5M
Location Alias 2: 00/16-21-072-05 W5/00
Country: Canada
Province: Alberta
Township: 072
Meridian: 5
Range: 05
Section: 21
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: HOME ET AL MITSUE 16-21-72-5
Operator Name: Devon Canada Corporation
License Number: 0028927
License Date: 1965-09-09
License Status: RecCertified
Spud Date: 1965-10-02
Final Drill Date: 1965-10-14
Well Total Depth: 1701.40 m
Surface Hole Latitude: 55.256397
Surface Hole Longitude: -114.696657

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-09-09 Obtained License
1965-10-04 Blowout Occurred
1965-10-11 Blowout Occurred
1965-10-14 Finished Drilling
1965-10-14 Well Mode changed to Drilled and Cased
1965-10-15 Production Casing Operation Performed
1965-11-03 Perforation Treatment Performed - Bullet Perforation
1965-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-11-06 Well Began Production
1965-11-06 Well Fluid changed to Crude Oil
1965-11-06 Well Mode changed to Flowing
1974-03-28 Well Fluid changed to Crude Oil
1974-03-28 Well Mode changed to Suspended
1993-08-24 Well Fluid changed to Crude Oil
1993-08-24 Well Mode changed to Pumping
1994-08-01 Well Fluid changed to Crude Oil
1994-08-01 Well Mode changed to Suspended
1995-11-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-11-09 Perforation Treatment Performed - Jet Perforation
1995-11-09 Perforation Treatment Performed - Remedial Casing
1995-11-09 Plug Back Performed
1995-11-14 Well Abandoned
1995-11-14 Well Fluid changed to Crude Oil
1995-11-14 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-11-03 Bullet Perforation 1682.20 1682.50 13
1965-11-03 Bullet Perforation 1683.40 1684.00 13
1965-11-03 Bullet Perforation 1682.80 1683.40 7
1965-11-05 Acid Treatment 1682.20 1684.00 0
1995-11-09 Packing Device Capped w/Cement 1662.00 1670.00 0
1995-11-09 Perforation 216.00 217.00 13
1995-11-09 Remedial Casing Cementing 216.00 217.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 2924 0.0 0.0 0.0
1968 1344 0.0 0.0 0.0
1969 2772 0.0 0.0 0.0
1970 7470 0.0 0.0 0.0
1971 5701 0.0 0.0 0.0
1972 2906 0.0 0.0 0.0
1993 1001 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1965-10-04 Blowout 1031.70 1031.70
1965-10-11 Blowout 1166.70 1598.60

For data sources see[6]

References