X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0716112810000

Well Details

Well ID: 0716112810000
Loading map...
Location: 00/10-28-071-11W6/0
Location Alias: 00/10-28-71-11 W6M
Location Alias 2: 00/10-28-071-11 W6/00
Country: Canada
Province: Alberta
Township: 071
Meridian: 6
Range: 11
Section: 28
County/Municipality: County of Grande Prairie No. 1
Well Name: HOME BEAVERLODGE 10-28-71-11
Operator Name: Devon Canada Corporation
License Number: 0064629
License Date: 1977-07-06
License Status: RecCertified
Spud Date: 1977-07-07
Final Drill Date: 1977-08-20
Well Total Depth: 2420.10 m
Surface Hole Latitude: 55.180670
Surface Hole Longitude: -119.623330

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-07-06 Obtained License
1977-08-09 Drill Stem Test Performed
1977-08-10 Drill Stem Test Performed
1977-08-11 Drill Stem Test Performed
1977-08-12 Drill Stem Test Performed
1977-08-20 Finished Drilling
1977-08-22 Well Log Performed
1977-08-23 Drill Stem Test Performed
1977-08-24 Drill Stem Test Performed
1977-08-26 Production Casing Operation Performed
1977-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-11-13 Perforation Treatment Performed - Jet Perforation
1977-11-14 Perforation Treatment Performed - Fractured
1977-11-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-11-19 Perforation Treatment Performed - Jet Perforation
1977-11-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-11-21 Perforation Treatment Performed - Jet Perforation
1977-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-11-23 Perforation Treatment Performed - Fractured
1977-11-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-11-25 Perforation Treatment Performed - Jet Perforation
1977-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-11-27 Perforation Treatment Performed - Fractured
1977-11-28 Perforation Treatment Performed - Jet Perforation
1977-11-28 Well Log Performed
1977-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-12-07 Perforation Treatment Performed - Fractured
1977-12-18 Perforation Treatment Performed - Jet Perforation
1977-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-12-20 Perforation Treatment Performed - Fractured
1978-01-02 Well Mode changed to Drilled and Cased
1993-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-09-23 Plug Back Performed
1993-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-09-24 Perforation Treatment Performed - Jet Perforation
1993-09-24 Perforation Treatment Performed - Remedial Casing
1993-09-24 Plug Back Performed
1993-09-24 Well Log Performed
1993-09-24 Well Mode changed to Abandoned
1993-11-11 Well Log Performed
1994-01-21 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-11-13 Perforation 2332.90 2335.40 7
1977-11-23 Fracture 1870.90 1878.50 0
1977-11-25 Packing Device Capped w/Cement 1859.30 1866.90 0
1977-11-25 Perforation 1209.40 1212.50 7
1977-11-26 Acid Treatment 1209.40 1212.50 0
1977-11-27 Fracture 1209.40 1212.50 0
1977-11-28 Perforation 1349.30 1352.40 7
1977-11-29 Acid Treatment 1349.30 1352.40 0
1977-12-07 Fracture 1349.30 1352.40 0
1977-12-18 Perforation 1377.10 1380.10 7
1977-12-19 Acid Treatment 1377.10 1380.10 0
1977-11-13 Acid Treatment 2332.90 2335.40 0
1977-12-20 Fracture 1377.10 1380.10 0
1993-09-23 Packing Device Capped w/Cement 1332.00 1340.00 0
1993-09-24 Packing Device Capped w/Cement 1188.00 1196.00 0
1993-09-24 Perforation 551.00 552.00 7
1993-09-24 Remedial Casing Cementing 551.00 552.00 0
1993-09-24 Packing Device Capped w/Cement 538.00 546.00 0
1977-11-14 Fracture 2332.90 2335.40 0
1977-11-19 Packing Device Capped w/Cement 2311.90 2319.50 0
1977-11-19 Perforation 2142.70 2145.80 7
1977-11-21 Packing Device Capped w/Cement 2116.80 2124.50 0
1977-11-21 Perforation 1870.90 1872.40 7
1977-11-21 Perforation 1875.40 1878.50 7
1977-11-22 Acid Treatment 1870.90 1878.50 0

For data sources see[4]



References