If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0715192512000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.180116,"lon":-116.792877,"icon":""}]} |
Location: 00/12-25-071-19W5/0 | |
Location Alias: 00/12-25-71-19 W5M | |
Location Alias 2: 00/12-25-071-19 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 071 | |
Meridian: 5 | |
Range: 19 | |
Section: 25 | |
County/Municipality: Big Lakes County | |
Well Name: LONG RUN SNIPELK 12-25-71-19 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0024920 | |
License Date: 1963-10-04 | |
License Status: Abandoned | |
Spud Date: 1963-10-11 | |
Final Drill Date: 1963-11-07 | |
Well Total Depth: 2676.10 m | |
Surface Hole Latitude: 55.180116 | |
Surface Hole Longitude: -116.792877 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1963-10-04 | Obtained License |
1963-11-06 | Drill Stem Test Performed |
1963-11-07 | Finished Drilling |
1963-11-09 | Production Casing Operation Performed |
1963-12-02 | Well Mode changed to Drilled and Cased |
1965-03-25 | Perforation Treatment Performed - Jet Perforation |
1965-03-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-03-30 | Well Began Injection |
1965-03-30 | Well Fluid changed to Water |
1965-03-30 | Well Type changed to Injection |
1965-07-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-09-01 | Well Fluid changed to Water |
1986-09-01 | Well Mode changed to Suspended |
1986-09-01 | Well Type changed to Injection |
1999-01-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-01-13 | Plug Back Performed |
1999-01-13 | Well Log Performed |
1999-02-11 | Well Fluid changed to Water |
1999-02-11 | Well Mode changed to Abandoned and Re-entered |
1999-02-11 | Well Type changed to Injection |
1999-02-12 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1965-03-25 | Perforation | 2595.70 | 2596.30 | 7 |
1965-03-25 | Perforation | 2597.20 | 2602.70 | 7 |
1965-03-25 | Perforation | 2613.40 | 2620.10 | 7 |
1965-03-26 | Acid Treatment | 2595.70 | 2620.10 | 0 |
1965-07-09 | Acid Treatment | 2595.70 | 2620.10 | 0 |
1999-01-13 | Packing Device Capped w/Cement | 2578.00 | 2586.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 0 | 0.0 | 0.0 | 0.0 |
1969 | 0 | 0.0 | 0.0 | 0.0 |
1970 | 0 | 0.0 | 0.0 | 0.0 |
1971 | 0 | 0.0 | 0.0 | 0.0 |
1972 | 0 | 0.0 | 0.0 | 0.0 |
1973 | 0 | 0.0 | 0.0 | 0.0 |
1974 | 0 | 0.0 | 0.0 | 0.0 |
1975 | 0 | 0.0 | 0.0 | 0.0 |
1976 | 0 | 0.0 | 0.0 | 0.0 |
1977 | 0 | 0.0 | 0.0 | 0.0 |
1978 | 0 | 0.0 | 0.0 | 0.0 |
1979 | 0 | 0.0 | 0.0 | 0.0 |
1980 | 0 | 0.0 | 0.0 | 0.0 |
1981 | 0 | 0.0 | 0.0 | 0.0 |
1982 | 0 | 0.0 | 0.0 | 0.0 |
1983 | 0 | 0.0 | 0.0 | 0.0 |
1984 | 0 | 0.0 | 0.0 | 0.0 |
1985 | 0 | 0.0 | 0.0 | 0.0 |
1986 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]