X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0715192502000

Well Details

Well ID: 0715192502000
Loading map...
Location: 00/02-25-071-19W5/0
Location Alias: 00/02-25-71-19 W5M
Location Alias 2: 00/02-25-071-19 W5/00
Country: Canada
Province: Alberta
Township: 071
Meridian: 5
Range: 19
Section: 25
County/Municipality: Big Lakes County
Well Name: LONG RUN SNIPELK 2-25-71-19
Operator Name: Long Run Exploration Ltd.
License Number: 0025643
License Date: 1964-02-04
License Status: Abandoned
Spud Date: 1964-02-27
Final Drill Date: 1964-03-24
Well Total Depth: 2639.30 m
Surface Hole Latitude: 55.174665
Surface Hole Longitude: -116.778117

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-02-04 Obtained License
1964-02-27 Direction Drilling Operation Performed - 98
1964-03-24 Finished Drilling
1964-03-24 Well Mode changed to Drilled and Cased
1964-03-26 Production Casing Operation Performed
1964-04-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-04-04 Perforation Treatment Performed - Jet Perforation
1964-04-17 Well Began Production
1964-04-17 Well Fluid changed to Crude Oil
1964-04-17 Well Mode changed to Flowing
1964-11-18 Well Fluid changed to Crude Oil
1964-11-18 Well Mode changed to Pumping
1972-08-01 Well Began Injection
1972-08-01 Well Fluid changed to Water
1972-08-01 Well Type changed to Injection
1972-08-22 Perforation Treatment Performed - Jet Perforation
1972-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-09-30 Well Fluid changed to Water
1994-09-30 Well Mode changed to Suspended
1994-09-30 Well Type changed to Injection
1999-01-08 Well Log Performed
1999-01-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-01-09 Perforation Treatment Performed - Jet Perforation
1999-01-09 Perforation Treatment Performed - Remedial Casing
1999-01-09 Plug Back Performed
1999-02-12 Well Abandoned
1999-02-12 Well Fluid changed to Water
1999-02-12 Well Mode changed to Abandoned and Re-entered
1999-02-12 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1964-02-27 2038.20 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-04-04 Perforation 2615.20 2616.70 3
1999-01-09 Remedial Casing Cementing 288.00 288.30 0
1964-04-04 Acid Treatment 2615.20 2616.70 0
1972-08-22 Perforation 2615.80 2621.90 13
1972-08-23 Acid Treatment 2615.20 2621.90 0
1972-08-23 Acid Treatment 2615.20 2621.90 0
1979-09-22 Acid Treatment 2615.20 2621.90 0
1988-05-18 Acid Treatment 2615.20 2621.90 0
1999-01-09 Packing Device Capped w/Cement 2578.00 2586.00 0
1999-01-09 Perforation 288.00 288.30 7

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1999-02-12 No Incident Encountered 0.00 0.00

For data sources see[7]

References