X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0715183204000

Well Details

Well ID: 0715183204000
Loading map...
Location: 00/04-32-071-18W5/0
Location Alias: 00/04-32-71-18 W5M
Location Alias 2: 00/04-32-071-18 W5/00
Country: Canada
Province: Alberta
Township: 071
Meridian: 5
Range: 18
Section: 32
County/Municipality: Big Lakes County
Well Name: LONG RUN SNIPELK 4-32-71-18
Operator Name: Long Run Exploration Ltd.
License Number: 0026939
License Date: 1964-10-07
License Status: Amended
Spud Date: 1964-10-14
Final Drill Date: 1964-11-06
Well Total Depth: 2636.50 m
Surface Hole Latitude: 55.186592
Surface Hole Longitude: -116.742990

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-10-07 Obtained License
1964-11-06 Finished Drilling
1964-11-06 Well Mode changed to Drilled and Cased
1964-11-09 Production Casing Operation Performed
1964-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-11-11 Perforation Treatment Performed - Jet Perforation
1964-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-11-13 Perforation Treatment Performed - Jet Perforation
1964-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-11-27 Well Began Production
1964-11-27 Well Fluid changed to Crude Oil
1964-11-27 Well Mode changed to Pumping
1975-06-20 Well Fluid changed to Crude Oil
1975-06-20 Well Mode changed to Flowing
1981-12-01 Well Fluid changed to Crude Oil
1981-12-01 Well Mode changed to Suspended
2003-11-04 Well Log Performed
2003-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-08 Perforation Treatment Performed - Jet Perforation
2003-11-09 Perforation Treatment Performed - Remedial Casing
2003-11-11 Perforation Treatment Performed - Jet Perforation
2003-11-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-12 Perforation Treatment Performed - Jet Perforation
2003-11-14 Perforation Treatment Performed - Remedial Casing
2003-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-16 Perforation Treatment Performed - Jet Perforation
2003-11-18 Perforation Treatment Performed - Cement Plug
2003-11-18 Perforation Treatment Performed - Remedial Casing
2003-11-20 Perforation Treatment Performed - Jet Perforation
2003-11-21 Perforation Treatment Performed - Remedial Casing
2003-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-23 Perforation Treatment Performed - Jet Perforation
2003-11-24 Perforation Treatment Performed - Remedial Casing
2003-11-25 Perforation Treatment Performed - Jet Perforation
2003-11-26 Perforation Treatment Performed - Remedial Casing
2003-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-12-10 Plug Back Performed
2003-12-12 Plug Back Performed
2003-12-13 Well Fluid changed to Crude Oil
2003-12-13 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-11-11 Perforation 2611.20 2614.60 7
2003-11-08 Packing Device Capped w/Cement 2588.20 2596.20 0
2003-11-08 Perforation 2370.00 2371.00 14
2003-11-09 Remedial Casing Cementing 2370.00 2371.00 0
2003-11-11 Perforation 2350.00 2351.00 14
2003-11-12 Packing Device Capped w/Cement 2339.50 2347.50 0
2003-11-12 Perforation 2180.00 2181.00 14
2003-11-14 Remedial Casing Cementing 2180.00 2181.00 0
2003-11-16 Packing Device Capped w/Cement 2167.00 2175.00 0
2003-11-16 Perforation 1863.00 1864.00 14
2003-11-18 Remedial Casing Cementing 1863.00 1864.00 0
1964-11-11 Perforation 2615.80 2616.70 7
2003-11-18 Cement Plug 1811.60 1864.00 0
2003-11-20 Perforation 1633.50 1634.50 14
2003-11-21 Remedial Casing Cementing 1633.50 1634.50 0
2003-11-23 Packing Device Capped w/Cement 1622.00 1630.00 0
2003-11-23 Perforation 1578.50 1579.50 14
2003-11-24 Remedial Casing Cementing 1578.50 1579.50 0
2003-11-25 Perforation 1479.50 1480.50 14
2003-11-26 Remedial Casing Cementing 1479.50 1480.50 0
2003-11-27 Packing Device Capped w/Cement 1468.00 1476.00 0
1964-11-11 Perforation 2619.50 2622.20 7
1964-11-11 Acid Treatment 2611.20 2614.60 0
1964-11-13 Perforation 2611.80 2612.10 7
1964-11-13 Perforation 2613.40 2614.60 7
1964-11-13 Perforation 2615.80 2616.70 7
1964-11-13 Acid Treatment 2611.80 2616.70 0
1964-11-15 Acid Treatment 2611.80 2616.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1981 664 0.0 0.0 0.0

For data sources see[5]

References