X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0715180902020

Well Details

Well ID: 0715180902020
Loading map...
Location: 02/02-09-071-18W5/0
Location Alias: 02/02-09-71-18 W5M
Location Alias 2: 02/02-09-071-18 W5/00
Country: Canada
Province: Alberta
Township: 071
Meridian: 5
Range: 18
Section: 09
County/Municipality: Big Lakes County
Well Name: LONG RUN SNIPELK 2-9-71-18
Operator Name: Long Run Exploration Ltd.
License Number: 0025983
License Date: 1964-04-14
License Status: Suspension
Spud Date: 1964-03-29
Final Drill Date: 1964-04-17
Well Total Depth: 2642.60 m
Surface Hole Latitude: 55.129321
Surface Hole Longitude: -116.703248

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-04-14 Obtained License
1964-04-17 Finished Drilling
1964-04-17 Well Mode changed to Drilled and Cased
1964-04-19 Production Casing Operation Performed
1964-04-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-04-21 Perforation Treatment Performed - Selective Jet Perforations
1964-06-03 Well Began Production
1964-06-03 Well Fluid changed to Crude Oil
1964-06-03 Well Mode changed to Pumping
1964-09-17 Perforation Treatment Performed - Cement Squeeze
1964-09-18 Perforation Treatment Performed - Jet Perforation
1964-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-06-20 Well Fluid changed to Crude Oil
1975-06-20 Well Mode changed to Flowing
1981-04-12 Perforation Treatment Performed - Jet Perforation
1981-04-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-04-21 Well Fluid changed to Crude Oil
1981-04-21 Well Mode changed to Pumping
1983-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-06-14 Well Log Performed
1989-05-15 Well Fluid changed to Crude Oil
1989-05-15 Well Mode changed to Suspended
1993-03-11 Perforation Treatment Performed - Chemical Squeeze
1993-03-13 Perforation Treatment Performed - Chemical Squeeze
1993-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-17 Perforation Treatment Performed - Cement Squeeze
1997-01-31 Perforation Treatment Performed - Jet Perforation
1997-01-31 Well Log Performed
1997-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-02-07 Plug Back Performed
1997-02-07 Well Fluid changed to Crude Oil
1997-02-07 Well Log Performed
1997-02-07 Well Mode changed to Abandoned Zone
2000-08-12 Well Log Performed
2000-08-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-08-15 Perforation Treatment Performed - Jet Perforation
2000-08-15 Plug Back Performed
2000-08-15 Well Log Performed
2000-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-09-30 Well Log Performed
2002-05-30 Well Log Performed
2002-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-08-30 Well Log Performed
2009-12-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-12-20 Plug Back Performed
2009-12-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-04-21 Selective Jet Perforations 2596.90 2597.50 0
1964-09-19 Acid Treatment 2609.10 2610.00 0
1981-04-12 Perforation 2608.80 2609.70 13
1981-04-12 Perforation 2599.30 2602.30 13
1981-04-12 Perforation 2603.00 2604.50 13
1981-04-12 Perforation 2596.60 2597.50 13
1981-04-12 Perforation 2598.10 2598.70 13
1981-04-15 Acid Treatment 2596.60 2610.00 0
1983-11-11 Acid Treatment 2596.60 2610.00 0
1993-03-11 Chemical Squeeze 2596.60 2610.00 0
1993-03-13 Chemical Squeeze 2596.60 2610.00 0
1964-04-21 Selective Jet Perforations 2599.90 2600.20 0
1993-03-23 Acid Treatment 2596.60 2604.50 0
1997-01-17 Cement Squeeze 2596.60 2610.00 0
1997-01-31 Perforation 2614.00 2616.10 18
1997-02-05 Acid Treatment 2614.00 2616.00 0
1997-02-07 Packing Device Capped w/Cement 2579.00 2587.00 0
2000-08-15 Perforation 1420.70 1439.30 11
2000-08-15 Perforation 1445.40 1454.50 11
2000-08-15 Packing Device Capped w/Cement 1597.00 1605.00 0
2000-08-16 Acid Treatment 1420.00 1454.00 0
2002-06-24 Acid Treatment 1420.70 1454.50 0
1964-04-21 Selective Jet Perforations 2604.20 2604.50 0
2003-05-28 Acid Treatment 1420.70 1454.50 0
2009-12-20 Packing Device Capped w/Cement 1404.00 1412.00 0
2009-12-21 Packing Device Capped w/Cement 1311.80 1395.00 0
1964-04-21 Selective Jet Perforations 2609.40 2610.00 0
1964-04-21 Selective Jet Perforations 2610.60 2611.50 0
1964-04-21 Selective Jet Perforations 2613.40 2613.40 0
1964-04-21 Acid Treatment 2596.90 2613.40 0
1964-09-17 Cement Squeeze 2609.40 2613.40 0
1964-09-18 Perforation 2609.10 2610.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1980 4960 0.0 0.0 0.0
1981 4983 0.0 0.0 0.0
1982 6885 0.0 0.0 0.0
1983 7904 0.0 0.0 0.0
1984 8208 0.0 0.0 0.0
1985 7973 0.0 0.0 0.0
1986 4551 0.0 0.0 0.0
1987 7688 0.0 0.0 0.0
1988 7559 0.0 0.0 0.0
1989 2430 0.0 0.0 0.0

For data sources see[5]

References