X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0715080906000

Well Details

Well ID: 0715080906000
Loading map...
Location: 00/06-09-071-08W5/0
Location Alias: 00/06-09-71-08 W5M
Location Alias 2: 00/06-09-071-08 W5/00
Country: Canada
Province: Alberta
Township: 071
Meridian: 5
Range: 08
Section: 09
County/Municipality: Big Lakes County
Well Name: PCI ADAMS 6-9-71-8
Operator Name: Saba Energy Ltd.
License Number: 0074106
License Date: 1979-01-25
License Status: Abandoned
Spud Date: 1979-01-29
Final Drill Date: 1979-02-21
Well Total Depth: 2350.00 m
Surface Hole Latitude: 55.131976
Surface Hole Longitude: -115.172579

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-01-25 Obtained License
1979-02-03 Drill Stem Test Performed
1979-02-15 Drill Stem Test Performed
1979-02-21 Finished Drilling
1979-02-21 Well Mode changed to Drilled and Cased
1979-02-23 Drill Stem Test Performed
1979-03-06 Production Casing Operation Performed
1979-03-13 Perforation Treatment Performed - Abrasa-Jet Perforation
1979-03-13 Perforation Treatment Performed - Acid Wash - No Pressure
1979-03-14 Well Began Production
1979-03-14 Well Fluid changed to Crude Oil
1979-03-14 Well Mode changed to Pumping
1979-03-20 Well Fluid changed to Crude Oil
1979-03-20 Well Mode changed to Suspended
1979-09-01 Well Fluid changed to Crude Oil
1979-09-01 Well Mode changed to Pumping
1980-03-16 Well Fluid changed to Crude Oil
1980-03-16 Well Mode changed to Suspended
1980-11-01 Well Fluid changed to Crude Oil
1980-11-01 Well Mode changed to Pumping
1986-03-01 Well Fluid changed to Crude Oil
1986-03-01 Well Mode changed to Suspended
1987-09-01 Well Fluid changed to Crude Oil
1987-09-01 Well Mode changed to Pumping
1989-05-01 Well Fluid changed to Crude Oil
1989-05-01 Well Mode changed to Suspended
1997-01-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-01-13 Plug Back Performed
1997-01-17 Well Abandoned
1997-01-17 Well Fluid changed to Crude Oil
1997-01-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-03-13 Hydra Jet Perforation 2092.80 2092.80 0
1979-03-13 Hydra Jet Perforation 2094.20 2094.30 0
1979-03-13 Hydra Jet Perforation 2093.50 2093.60 0
1979-03-13 Acid Wash 2092.80 2094.30 0
1997-01-13 Packing Device Capped w/Cement 2072.00 2080.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 1441 0.0 0.0 0.0
1980 1809 0.0 0.0 0.0
1981 6539 0.0 0.0 0.0
1982 7447 0.0 0.0 0.0
1983 8157 0.0 0.0 0.0
1984 8496 0.0 0.0 0.0
1985 8680 0.0 0.0 0.0
1986 744 0.0 0.0 0.0
1987 2487 0.0 0.0 0.0
1988 3895 0.0 0.0 0.0

For data sources see[5]

References