X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0715040110000

Well Details

Well ID: 0715040110000
Loading map...
Location: 00/10-01-071-04W5/0
Location Alias: 00/10-01-71-04 W5M
Location Alias 2: 00/10-01-071-04 W5/00
Country: Canada
Province: Alberta
Township: 071
Meridian: 5
Range: 04
Section: 01
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: CALSTAN HONDO 10-1-71-4
Operator Name: Chevron Canada Limited
License Number: 0026786
License Date: 1964-09-14
License Status: RecCertified
Spud Date: 1964-09-29
Final Drill Date: 1964-11-29
Well Total Depth: 1813.00 m
Surface Hole Latitude: 55.121808
Surface Hole Longitude: -114.472362

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-09-14 Obtained License
1964-09-30 Lost Circulation Occurred
1964-10-05 Lost Circulation Occurred
1964-11-22 Production Casing Operation Performed
1964-11-29 Finished Drilling
1964-11-29 Perforation Treatment Performed - Open-Hole Completion
1964-11-29 Well Mode changed to Drilled and Cased
1964-12-10 Well Began Production
1964-12-10 Well Fluid changed to Crude Oil
1964-12-10 Well Mode changed to Flowing
1973-07-05 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1988-01-01 Well Fluid changed to Crude Oil
1988-01-01 Well Mode changed to Suspended
1988-07-01 Well Fluid changed to Crude Oil
1988-07-01 Well Mode changed to Pumping
1993-03-05 Perforation Treatment Performed - Cement Plug
1993-03-05 Plug Back Performed
1993-03-05 Well Fluid changed to Crude Oil
1993-03-05 Well Mode changed to Abandoned Zone
1995-02-11 Perforation Treatment Performed - Jet Perforation
1995-03-08 Perforation Treatment Performed - Remedial Casing
1995-03-08 Well Fluid changed to Crude Oil
1995-03-08 Well Mode changed to Abandoned
1995-03-17 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-11-29 Open Hole/Barefoot Completion 1790.10 1813.00 0
1973-07-05 Resin-Gypsum Squeeze or Plug 1792.80 1796.20 0
1993-03-05 Cement Plug 1761.90 1807.60 0
1995-02-11 Perforation 230.00 231.00 13
1995-03-08 Remedial Casing Cementing 230.00 231.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4513 0.0 0.0 0.0
1968 4525 0.0 0.0 0.0
1969 7601 0.0 0.0 0.0
1970 7207 0.0 0.0 0.0
1971 7357 0.0 0.0 0.0
1973 2360 0.0 0.0 0.0
1974 8162 0.0 0.0 0.0
1975 6815 0.0 0.0 0.0
1977 2165 0.0 0.0 0.0
1978 6127 0.0 0.0 0.0
1979 7516 0.0 0.0 0.0
1980 7073 0.0 0.0 0.0
1981 6966 0.0 0.0 0.0
1982 7160 0.0 0.0 0.0
1983 7392 0.0 0.0 0.0
1984 7653 0.0 0.0 0.0
1985 7548 0.0 0.0 0.0
1986 4787 0.0 0.0 0.0
1988 3760 0.0 0.0 0.0
1989 8293 0.0 0.0 0.0
1990 7640 0.0 0.0 0.0
1991 7977 0.0 0.0 0.0
1992 8599 0.0 0.0 0.0
1993 1416 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1964-09-30 Lost Circulation 918.90 918.90
1964-10-05 Lost Circulation 1196.90 1196.90

For data sources see[6]

References