If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0714190210002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.121422,"lon":-112.808181,"icon":""}]} |
Location: 00/10-02-071-19W4/2 | |
Location Alias: 00/10-02-71-19 W4M | |
Location Alias 2: 00/10-02-071-19 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 071 | |
Meridian: 4 | |
Range: 19 | |
Section: 02 | |
County/Municipality: Athabasca County | |
Well Name: DAYLIGHT CALL 10-2-71-19 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0068869 | |
License Date: 1978-03-16 | |
License Status: Suspension | |
Spud Date: 1978-03-18 | |
Final Drill Date: 1978-03-22 | |
Well Total Depth: 487.70 m | |
Surface Hole Latitude: 55.121422 | |
Surface Hole Longitude: -112.808181 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-03-16 | Obtained License |
1978-03-22 | Finished Drilling |
1978-03-23 | Production Casing Operation Performed |
1979-12-17 | Perforation Treatment Performed - Jet Perforation |
1979-12-17 | Well Log Performed |
1979-12-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-12-20 | Perforation Treatment Performed - Jet Perforation |
1979-12-20 | Well Mode changed to Drilled and Cased |
2001-01-21 | Perforation Treatment Performed - Cement Squeeze |
2001-02-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-02-09 | Perforation Treatment Performed - Jet Perforation |
2001-02-09 | Plug Back Performed |
2001-02-09 | Well Mode changed to Abandoned Zone |
2011-03-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-03-06 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-12-17 | Perforation | 474.90 | 477.00 | 13 |
1979-12-18 | Acid Treatment | 474.90 | 477.00 | 0 |
1979-12-20 | Perforation | 315.20 | 317.00 | 13 |
2001-01-21 | Cement Squeeze | 315.20 | 317.00 | 0 |
2001-02-09 | Packing Device Capped w/Cement | 466.50 | 468.50 | 0 |
2001-02-09 | Packing Device Capped w/Cement | 452.00 | 460.00 | 0 |
2001-02-09 | Packing Device Capped w/Cement | 300.00 | 308.00 | 0 |
2001-02-09 | Perforation | 271.20 | 272.50 | 13 |
2011-03-06 | Packing Device Capped w/Cement | 255.00 | 263.00 | 0 |
For data sources see[4]