X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0714190210002

Well Details

Well ID: 0714190210002
Loading map...
Location: 00/10-02-071-19W4/2
Location Alias: 00/10-02-71-19 W4M
Location Alias 2: 00/10-02-071-19 W4/02
Country: Canada
Province: Alberta
Township: 071
Meridian: 4
Range: 19
Section: 02
County/Municipality: Athabasca County
Well Name: DAYLIGHT CALL 10-2-71-19
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0068869
License Date: 1978-03-16
License Status: Suspension
Spud Date: 1978-03-18
Final Drill Date: 1978-03-22
Well Total Depth: 487.70 m
Surface Hole Latitude: 55.121422
Surface Hole Longitude: -112.808181

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-03-16 Obtained License
1978-03-22 Finished Drilling
1978-03-23 Production Casing Operation Performed
1979-12-17 Perforation Treatment Performed - Jet Perforation
1979-12-17 Well Log Performed
1979-12-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-12-20 Perforation Treatment Performed - Jet Perforation
1979-12-20 Well Mode changed to Drilled and Cased
2001-01-21 Perforation Treatment Performed - Cement Squeeze
2001-02-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-02-09 Perforation Treatment Performed - Jet Perforation
2001-02-09 Plug Back Performed
2001-02-09 Well Mode changed to Abandoned Zone
2011-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-06 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-12-17 Perforation 474.90 477.00 13
1979-12-18 Acid Treatment 474.90 477.00 0
1979-12-20 Perforation 315.20 317.00 13
2001-01-21 Cement Squeeze 315.20 317.00 0
2001-02-09 Packing Device Capped w/Cement 466.50 468.50 0
2001-02-09 Packing Device Capped w/Cement 452.00 460.00 0
2001-02-09 Packing Device Capped w/Cement 300.00 308.00 0
2001-02-09 Perforation 271.20 272.50 13
2011-03-06 Packing Device Capped w/Cement 255.00 263.00 0

For data sources see[4]



References