X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0706092407000

Well Details

Well ID: 0706092407000
Loading map...
Location: 00/07-24-070-09W6/0
Location Alias: 00/07-24-70-09 W6M
Location Alias 2: 00/07-24-070-09 W6/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 6
Range: 09
Section: 24
County/Municipality: County of Grande Prairie No. 1
Well Name: ECA HZ ELM 7-24-70-9
Operator Name: Ovintiv Canada ULC
License Number: 0466074
License Date: 2014-04-04
License Status: Amended
Spud Date: 2014-07-04
Final Drill Date: 2014-07-22
Well Total Depth: 5031.00 m
Surface Hole Latitude: 55.057754
Surface Hole Longitude: -119.200516

For data sources see[1][2]

Well History

Date Event
2014-04-04 Obtained License
2014-07-04 Direction Drilling Operation Performed - Deviate
2014-07-05 Surface Casing Operation Performed
2014-07-10 Direction Drilling Operation Performed - Deviate
2014-07-13 Intermediate Casing Operation Performed
2014-07-14 Direction Drilling Operation Performed - Horizontal
2014-07-22 Finished Drilling
2014-07-22 Well Log Performed
2014-07-22 Well Mode changed to Drilled and Cased
2014-07-24 Liner Casing Operation Performed
2014-07-24 Perforation Treatment Performed - Open-Hole Completion
2014-07-25 Rig Released
2014-08-08 Perforation Treatment Performed - Multi-Stage Fracture
2014-08-09 Perforation Treatment Performed - Multi-Stage Fracture
2014-09-16 Perforation Treatment Performed - Multi-Stage Fracture
2014-09-17 Perforation Treatment Performed - Multi-Stage Fracture
2014-09-18 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-02 Well Fluid changed to Gas
2014-10-02 Well Mode changed to Testing
2014-10-03 Well Began Production
2014-10-03 Well Fluid changed to Gas
2014-10-03 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-07-04 Precision Drilling Corporation 530 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-07-04 192.80 Deviate (5 - 79 degrees)
2014-07-10 2279.70 Deviate (5 - 79 degrees)
2014-07-14 2611.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-07-24 Open Hole/Barefoot Completion 5016.00 5031.00 0
2014-09-17 Multi-Stage Fracture 3853.50 3854.70 0
2014-09-17 Multi-Stage Fracture 3768.80 3770.00 0
2014-09-17 Multi-Stage Fracture 3697.80 3699.10 0
2014-09-17 Multi-Stage Fracture 3632.10 3633.30 0
2014-09-17 Multi-Stage Fracture 3561.20 3562.40 0
2014-09-17 Multi-Stage Fracture 3490.40 3491.70 0
2014-09-17 Multi-Stage Fracture 3419.50 3420.70 0
2014-09-17 Multi-Stage Fracture 3349.20 3350.40 0
2014-09-17 Multi-Stage Fracture 3277.80 3279.00 0
2014-09-18 Multi-Stage Fracture 3206.80 3208.10 0
2014-08-08 Multi-Stage Fracture 4978.30 4994.20 0
2014-09-18 Multi-Stage Fracture 3124.10 3125.30 0
2014-09-18 Multi-Stage Fracture 3056.70 3057.90 0
2014-09-18 Multi-Stage Fracture 2987.40 2988.60 0
2014-09-18 Multi-Stage Fracture 2917.40 2918.60 0
2014-09-18 Multi-Stage Fracture 2834.70 2835.90 0
2014-09-18 Multi-Stage Fracture 2763.20 2764.40 0
2014-09-18 Multi-Stage Fracture 2692.10 2693.40 0
2014-08-08 Multi-Stage Fracture 4910.60 4911.80 0
2014-08-09 Multi-Stage Fracture 4839.60 4840.80 0
2014-08-09 Multi-Stage Fracture 4768.10 4769.30 0
2014-08-09 Multi-Stage Fracture 4698.60 4699.80 0
2014-08-09 Multi-Stage Fracture 4629.80 4631.00 0
2014-09-16 Multi-Stage Fracture 3994.50 3995.70 0
2014-09-16 Multi-Stage Fracture 3924.50 3925.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-08-08 2014-09-18 2,520 22,258 N/A
2 2014-09-18 2014-09-18 2,520 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 85.419 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 14.3873 N/A
ASPEN-FR-27 Aspen Polymers Friction Reducer Ethylene Glycol 107-21-1 100 0.0019 N/A
Non-Hazardous Not Available 100 0.062 N/A
2 Sand 30/50 Trican silica crystalline 14808-60-7 100 3.2406 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-08-06 2014-08-07 Central Water Distribution Facility 2941
2014-08-05 2014-08-12 Surface Water - River 12189
2014-09-14 2014-09-17 Surface Water - Runoff 7753
2014-09-17 2014-09-17 Surface Water - Runoff 954
2014-09-18 2014-09-18 Surface Water - Runoff 723
2014-08-04 2014-08-04 Municipal Water 9
2014-09-04 2014-09-04 Municipal Water 90
2014-09-27 2014-09-27 Municipal Water 60

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 1383 0.0 0.0 0.0
2015 8377 0.0 0.0 0.0
2016 8703 0.0 0.0 0.0
2017 8675 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 744 0.0 0.0 0.0
2020 1403 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-07-25 No Incident Encountered 0.00 0.00
2014-10-02 No Incident Encountered 0.00 0.00

For data sources see[10]

References