0705182610000

Well Details

Well ID: 0705182610000
Loading map...
Location: 00/10-26-070-18W5/0
Location Alias: 00/10-26-70-18 W5M
Location Alias 2: 00/10-26-070-18 W5/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 5
Range: 18
Section: 26
County/Municipality: Big Lakes County
Well Name: LONG RUN SNIPELK 10-26-70-18
Operator Name: Long Run Exploration Ltd.
License Number: 0025573
License Date: 1964-01-27
License Status: Issued
Spud Date: 1964-01-27
Final Drill Date: 1964-02-16
Well Total Depth: 2651.80 m
Surface Hole Latitude: 55.091950
Surface Hole Longitude: -116.630058

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-01-27 Obtained License
1964-02-16 Finished Drilling
1964-02-16 Well Mode changed to Drilled and Cased
1964-02-17 Production Casing Operation Performed
1964-02-18 Well Log Performed
1964-02-20 Perforation Treatment Performed - Jet Perforation
1964-02-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-02-21 Well Began Production
1964-02-21 Well Fluid changed to Crude Oil
1964-02-21 Well Mode changed to Flowing
1965-04-16 Well Fluid changed to Crude Oil
1965-04-16 Well Mode changed to Pumping
1966-03-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1966-03-27 Perforation Treatment Performed - Jet Perforation
1966-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-12-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-06 Perforation Treatment Performed - Cement Squeeze
1982-11-17 Perforation Treatment Performed - Jet Perforation
1982-11-18 Perforation Treatment Performed - Jet Perforation
1982-11-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-09-26 Perforation Treatment Performed - Jet Perforation
1994-09-26 Well Log Performed
1994-09-27 Perforation Treatment Performed - Chemical Squeeze
1994-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-11 Well Began Injection
1994-11-11 Well Fluid changed to Water
1994-11-11 Well Type changed to Injection
1994-12-07 Well Log Performed
1997-08-20 Well Log Performed
2003-05-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-06-29 Perforation Treatment Performed - Chemical Squeeze
2003-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-05-16 Perforation Treatment Performed - Jet Perforation
2004-05-16 Well Log Performed
2004-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-06-24 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-02-20 Perforation 2608.50 2610.90 7
1982-11-06 Cement Squeeze 2598.40 2610.90 0
1982-11-17 Perforation 2619.10 2620.40 7
1982-11-17 Perforation 2625.50 2626.50 7
1982-11-18 Perforation 2608.50 2614.60 13
1982-11-18 Perforation 2619.10 2622.50 13
1982-11-18 Perforation 2623.70 2624.70 13
1982-11-18 Perforation 2624.70 2627.70 13
1982-11-18 Perforation 2628.30 2629.20 13
1982-11-18 Perforation 2638.90 2641.40 13
1982-11-24 Acid Treatment 2608.50 2641.40 0
1964-02-20 Perforation 2619.10 2620.40 7
1994-09-26 Perforation 2599.30 2604.50 13
1994-09-27 Chemical Squeeze 2599.30 2604.50 0
1994-09-28 Acid Treatment 2599.30 2629.20 0
2003-05-24 Acid Treatment 2599.00 2629.00 0
2003-06-29 Chemical Squeeze 2599.30 2641.40 0
2003-06-30 Acid Treatment 2599.30 2641.40 0
2004-05-16 Perforation 2599.00 2600.00 13
2004-05-16 Perforation 2602.00 2604.00 13
2004-05-16 Perforation 2607.00 2614.00 13
2004-05-16 Perforation 2618.70 2621.50 13
1964-02-20 Perforation 2625.50 2626.50 7
2004-05-16 Perforation 2623.50 2627.50 13
2004-05-16 Perforation 2631.90 2634.50 13
2004-05-16 Perforation 2638.00 2642.50 13
2004-05-18 Acid Treatment 2599.00 2642.50 0
1964-02-21 Acid Treatment 2608.50 2626.50 0
1966-03-27 Packing Device Capped w/Cement 2616.70 2616.70 0
1966-03-27 Perforation 2598.40 2601.50 7
1966-03-27 Perforation 2602.40 2604.80 7
1966-03-28 Acid Treatment 2598.40 2610.90 0
1970-12-30 Acid Treatment 2598.40 2610.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3495 0.0 0.0 0.0
1968 7007 0.0 0.0 0.0
1969 4341 0.0 0.0 0.0
1970 1331 0.0 0.0 0.0
1971 4016 0.0 0.0 0.0
1972 7120 0.0 0.0 0.0
1973 5152 0.0 0.0 0.0
1974 6468 0.0 0.0 0.0
1975 7775 0.0 0.0 0.0
1976 5982 0.0 0.0 0.0
1977 7144 0.0 0.0 0.0
1978 3703 0.0 0.0 0.0
1979 7814 0.0 0.0 0.0
1980 7528 0.0 0.0 0.0
1981 7171 0.0 0.0 0.0
1982 6667 0.0 0.0 0.0
1983 7139 0.0 0.0 0.0
1984 7498 0.0 0.0 0.0
1985 6735 0.0 0.0 0.0
1986 7454 0.0 0.0 0.0
1987 8139 0.0 0.0 0.0
1988 7781 0.0 0.0 0.0
1989 8306 0.0 0.0 0.0
1990 8090 0.0 0.0 0.0
1991 8410 0.0 0.0 0.0
1992 8463 0.0 0.0 0.0
1993 8507 0.0 0.0 0.0
1994 5893 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]