X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0705182110000

Well Details

Well ID: 0705182110000
Loading map...
Location: 00/10-21-070-18W5/0
Location Alias: 00/10-21-70-18 W5M
Location Alias 2: 00/10-21-070-18 W5/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 5
Range: 18
Section: 21
County/Municipality: Big Lakes County
Well Name: LONG RUN SNIPELK 10-21-70-18
Operator Name: Long Run Exploration Ltd.
License Number: 0023035
License Date: 1962-09-20
License Status: Abandoned
Spud Date: 1962-09-23
Final Drill Date: 1962-11-02
Well Total Depth: 2906.60 m
Surface Hole Latitude: 55.077706
Surface Hole Longitude: -116.680198

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-09-20 Obtained License
1962-10-24 Drill Stem Test Performed
1962-10-26 Drill Stem Test Performed
1962-11-02 Finished Drilling
1962-11-02 Well Mode changed to Drilled and Cased
1962-11-04 Production Casing Operation Performed
1963-01-18 Perforation Treatment Performed - Jet Perforation
1963-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-12-14 Perforation Treatment Performed - Cement Squeeze
1963-12-17 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-12-17 Well Log Performed
1963-12-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-01-31 Well Began Production
1964-01-31 Well Fluid changed to Crude Oil
1964-01-31 Well Mode changed to Pumping
1965-07-12 Perforation Treatment Performed - Jet Perforation
1965-07-12 Perforation Treatment Performed - Open-Hole Completion
1965-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-07-15 Well Began Injection
1965-07-15 Well Fluid changed to Water
1965-07-15 Well Type changed to Injection
1965-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-07-14 Perforation Treatment Performed - Jet Perforation
1970-07-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-07-15 Perforation Treatment Performed - Acid Wash - No Pressure
1984-03-01 Well Fluid changed to Water
1984-03-01 Well Mode changed to Suspended
1984-03-01 Well Type changed to Injection
1986-10-01 Well Fluid changed to Water
1986-10-01 Well Type changed to Injection
1987-01-01 Well Fluid changed to Water
1987-01-01 Well Mode changed to Suspended
1987-01-01 Well Type changed to Injection
2009-03-24 Well Log Performed
2009-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-25 Perforation Treatment Performed - Jet Perforation
2009-03-25 Plug Back Performed
2009-03-25 Well Fluid changed to Water
2009-03-25 Well Mode changed to Abandoned Zone
2009-03-25 Well Type changed to Injection
2009-03-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-26 Perforation Treatment Performed - Remedial Casing
2009-03-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-27 Perforation Treatment Performed - Jet Perforation
2009-03-27 Well Log Performed
2009-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-03-28 Well Log Performed
2009-03-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-29 Perforation Treatment Performed - Jet Perforation
2009-03-29 Perforation Treatment Performed - Remedial Casing
2009-03-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-30 Perforation Treatment Performed - Remedial Casing
2009-03-31 Well Abandoned
2009-03-31 Well Fluid changed to Water
2009-03-31 Well Mode changed to Abandoned
2009-03-31 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-01-18 Perforation 2656.00 2658.20 7
1965-07-12 Perforation 2666.10 2672.80 7
1965-07-13 Acid Treatment 2654.50 2672.80 0
1965-09-20 Acid Treatment 2654.50 2672.80 0
1970-07-14 Perforation 2652.10 2654.20 7
1970-07-14 Perforation 2660.90 2662.10 7
1970-07-14 Perforation 2662.70 2664.00 7
1970-07-14 Perforation 2676.10 2678.90 7
1970-07-14 Perforation 2679.50 2681.00 7
1970-07-14 Perforation 2683.20 2684.10 7
1970-07-15 Acid Wash 2652.10 2684.10 0
1963-01-31 Acid Treatment 2656.00 2658.20 0
1970-07-15 Acid Treatment 2652.10 2684.10 0
2009-03-25 Packing Device Capped w/Cement 2639.00 2647.00 0
2009-03-25 Perforation 1038.00 1039.00 13
2009-03-26 Remedial Casing Cementing 1038.00 1039.00 0
2009-03-26 Packing Device Capped w/Cement 1025.00 1036.00 0
2009-03-27 Perforation 986.00 987.00 13
2009-03-27 Packing Device Capped w/Cement 975.00 983.00 0
2009-03-27 Perforation 808.00 809.00 13
2009-03-28 Acid Treatment 808.00 809.00 0
2009-03-29 Remedial Casing Cementing 808.00 809.00 0
1963-12-14 Cement Squeeze 2656.00 2658.20 0
2009-03-29 Packing Device Capped w/Cement 795.00 805.00 0
2009-03-29 Perforation 484.00 485.00 13
2009-03-30 Remedial Casing Cementing 484.00 485.00 0
2009-03-30 Packing Device Capped w/Cement 470.00 482.00 0
1963-12-17 Hydra Jet Perforation 2654.80 2654.80 0
1963-12-18 Acid Treatment 2654.80 2654.80 0
1963-12-22 Acid Treatment 2654.80 2654.80 0
1965-07-12 Open Hole/Barefoot Completion 2671.90 2704.80 0
1965-07-12 Perforation 2654.50 2658.20 7
1965-07-12 Perforation 2660.00 2660.90 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0

For data sources see[5]

References