If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0705181302000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.055109,"lon":-116.60549,"icon":""}]} |
Location: 00/02-13-070-18W5/0 | |
Location Alias: 00/02-13-70-18 W5M | |
Location Alias 2: 00/02-13-070-18 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 070 | |
Meridian: 5 | |
Range: 18 | |
Section: 13 | |
County/Municipality: Big Lakes County | |
Well Name: LONG RUN SNIPELK 2-13-70-18 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0025868 | |
License Date: 1964-03-12 | |
License Status: Suspension | |
Spud Date: 1964-03-15 | |
Final Drill Date: 1964-04-11 | |
Well Total Depth: 2700.50 m | |
Surface Hole Latitude: 55.055109 | |
Surface Hole Longitude: -116.605490 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1964-03-12 | Obtained License |
1964-04-11 | Finished Drilling |
1964-04-11 | Well Mode changed to Drilled and Cased |
1964-04-29 | Production Casing Operation Performed |
1964-05-16 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1964-05-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1964-07-02 | Well Began Production |
1964-07-02 | Well Fluid changed to Crude Oil |
1964-07-02 | Well Mode changed to Pumping |
1975-06-19 | Well Fluid changed to Crude Oil |
1975-06-19 | Well Mode changed to Flowing |
1977-09-23 | Perforation Treatment Performed - Jet Perforation |
1977-09-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1977-10-01 | Well Fluid changed to Crude Oil |
1977-10-01 | Well Mode changed to Pumping |
1977-12-01 | Well Fluid changed to Crude Oil |
1977-12-01 | Well Mode changed to Suspended |
2003-06-27 | Perforation Treatment Performed - Cement Plug |
2003-06-27 | Plug Back Performed |
2003-06-27 | Well Fluid changed to Crude Oil |
2003-06-27 | Well Mode changed to Abandoned and Whipstocked |
2003-07-21 | Perforation Treatment Performed - Cement Plug |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1964-05-16 | Hydra Jet Perforation | 2677.10 | 2678.00 | 0 |
1964-05-16 | Hydra Jet Perforation | 2678.00 | 2678.60 | 0 |
1964-05-16 | Hydra Jet Perforation | 2680.10 | 2680.70 | 0 |
1964-05-17 | Acid Treatment | 2677.10 | 2680.70 | 0 |
1977-09-23 | Perforation | 2676.10 | 2679.20 | 10 |
1977-09-30 | Acid Treatment | 2676.10 | 2680.70 | 0 |
2003-06-27 | Cement Plug | 1288.00 | 1920.00 | 0 |
2003-07-21 | Cement Plug | 550.00 | 595.00 | 0 |
2003-07-21 | Cement Plug | 217.00 | 325.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 72 | 0.0 | 0.0 | 0.0 |
1977 | 912 | 0.0 | 0.0 | 0.0 |
For data sources see[5]