X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0705181204000

Well Details

Well ID: 0705181204000
Loading map...
Location: 00/04-12-070-18W5/0
Location Alias: 00/04-12-70-18 W5M
Location Alias 2: 00/04-12-070-18 W5/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 5
Range: 18
Section: 12
County/Municipality: Big Lakes County
Well Name: LONG RUN SNIPELK 4-12-70-18
Operator Name: Long Run Exploration Ltd.
License Number: 0025352
License Date: 1963-12-18
License Status: Abandoned
Spud Date: 1964-03-20
Final Drill Date: 1964-04-20
Well Total Depth: 2735.60 m
Surface Hole Latitude: 55.042064
Surface Hole Longitude: -116.616461

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-12-18 Obtained License
1964-04-20 Finished Drilling
1964-04-20 Well Mode changed to Drilled and Cased
1964-04-21 Production Casing Operation Performed
1964-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-04-24 Perforation Treatment Performed - Jet Perforation
1964-04-24 Well Began Production
1964-04-24 Well Fluid changed to Crude Oil
1964-04-24 Well Mode changed to Flowing
1966-12-01 Well Fluid changed to Crude Oil
1966-12-01 Well Mode changed to Suspended
1979-07-26 Perforation Treatment Performed - Jet Perforation
1979-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-11-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-28 Perforation Treatment Performed - Jet Perforation
2009-11-28 Plug Back Performed
2009-11-28 Well Fluid changed to Crude Oil
2009-11-28 Well Mode changed to Abandoned Zone
2009-11-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-29 Perforation Treatment Performed - Remedial Casing
2009-11-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-11-30 Perforation Treatment Performed - Jet Perforation
2009-12-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-12-01 Perforation Treatment Performed - Jet Perforation
2009-12-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-12-03 Perforation Treatment Performed - Remedial Casing
2009-12-06 Perforation Treatment Performed - Jet Perforation
2009-12-07 Perforation Treatment Performed - Remedial Casing
2009-12-08 Well Abandoned
2009-12-08 Well Fluid changed to Crude Oil
2009-12-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-04-24 Perforation 2711.80 2715.20 7
2009-11-30 Acid Treatment 638.00 639.00 0
2009-12-01 Packing Device Capped w/Cement 626.30 636.00 0
2009-12-01 Perforation 597.00 598.00 21
2009-12-03 Remedial Casing Cementing 597.00 598.00 0
2009-12-03 Packing Device Capped w/Cement 571.70 594.00 0
2009-12-06 Perforation 222.00 223.00 13
2009-12-07 Remedial Casing Cementing 222.00 223.00 0
1964-04-24 Acid Treatment 2711.80 2715.20 0
1979-07-26 Perforation 2707.20 2709.50 13
1979-07-27 Acid Treatment 2707.20 2709.50 0
2009-11-28 Packing Device Capped w/Cement 2692.30 2702.00 0
2009-11-28 Perforation 738.00 739.00 13
2009-11-29 Remedial Casing Cementing 738.00 739.00 0
2009-11-29 Packing Device Capped w/Cement 724.50 736.00 0
2009-11-30 Perforation 638.00 639.00 21

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0

For data sources see[5]

References