X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0705181102000

Well Details

Well ID: 0705181102000
Loading map...
Location: 00/02-11-070-18W5/0
Location Alias: 00/02-11-70-18 W5M
Location Alias 2: 00/02-11-070-18 W5/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 5
Range: 18
Section: 11
County/Municipality: Big Lakes County
Well Name: LONG RUN SNIPELK 2-11-70-18
Operator Name: Long Run Exploration Ltd.
License Number: 0026589
License Date: 1964-07-31
License Status: Suspension
Spud Date: 1964-08-24
Final Drill Date: 1964-09-17
Well Total Depth: 2718.80 m
Surface Hole Latitude: 55.042208
Surface Hole Longitude: -116.627940

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-07-31 Obtained License
1964-09-17 Finished Drilling
1964-09-19 Production Casing Operation Performed
1964-09-23 Perforation Treatment Performed - Jet Perforation
1964-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-10-09 Perforation Treatment Performed - Cement Squeeze
1964-10-10 Perforation Treatment Performed - Bullet Perforation
1964-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-10-13 Perforation Treatment Performed - Cement Squeeze
1964-10-16 Perforation Treatment Performed - Jet Perforation
1964-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-10-23 Perforation Treatment Performed - Cement Squeeze
1964-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-10-26 Perforation Treatment Performed - Jet Perforation
1964-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-11-25 Well Mode changed to Drilled and Cased
1965-03-20 Perforation Treatment Performed - Jet Perforation
1965-03-20 Perforation Treatment Performed - Selective Jet Perforations
1965-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-03-26 Well Began Injection
1965-03-26 Well Fluid changed to Water
1965-03-26 Well Type changed to Injection
1969-06-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-08-01 Well Log Performed
1973-11-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-07-01 Well Fluid changed to Water
2011-07-01 Well Mode changed to Suspended
2011-07-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-09-23 Perforation 2699.90 2700.50 7
1964-10-10 Bullet Perforation 2696.00 2696.90 7
1964-10-11 Acid Treatment 2686.50 2696.90 0
1964-10-13 Cement Squeeze 2686.50 2696.90 0
1964-10-16 Perforation 2686.50 2688.30 13
1964-10-16 Perforation 2691.40 2692.90 13
1964-10-17 Acid Treatment 2686.50 2692.90 0
1964-10-22 Acid Treatment 2686.50 2692.90 0
1964-10-23 Cement Squeeze 2686.50 2692.90 0
1964-10-26 Perforation 2686.50 2688.30 13
1964-10-26 Perforation 2691.40 2692.90 13
1964-09-23 Perforation 2696.00 2696.90 7
1964-10-26 Acid Treatment 2686.50 2692.90 0
1964-10-30 Acid Treatment 2686.50 2692.90 0
1965-03-20 Selective Jet Perforations 2695.30 2695.30 0
1965-03-20 Perforation 2698.40 2700.50 7
1965-03-20 Perforation 2701.40 2704.80 7
1965-03-21 Acid Treatment 2695.30 2704.80 0
1969-06-21 Acid Treatment 2695.30 2704.80 0
1972-08-17 Acid Treatment 2686.50 2704.80 0
1973-11-14 Acid Treatment 2686.50 2704.80 0
1981-10-16 Acid Treatment 2686.00 2704.80 0
1964-09-23 Perforation 2691.40 2692.90 7
1964-09-23 Perforation 2686.50 2688.30 7
1964-09-24 Acid Treatment 2686.50 2700.50 0
1964-10-05 Acid Treatment 2686.50 2700.50 0
1964-10-09 Cement Squeeze 2686.50 2700.50 0
1964-10-10 Bullet Perforation 2686.50 2688.30 7
1964-10-10 Bullet Perforation 2691.40 2692.90 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0

For data sources see[5]

References