X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0705171916000

Well Details

Well ID: 0705171916000
Loading map...
Location: 00/16-19-070-17W5/0
Location Alias: 00/16-19-70-17 W5M
Location Alias 2: 00/16-19-070-17 W5/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 5
Range: 17
Section: 19
County/Municipality: Big Lakes County
Well Name: BPC ET AL SNIPE LAKE 16-19-70-17
Operator Name: Canadian Natural Resources Limited
License Number: 0163198
License Date: 1993-12-14
License Status: Re-Entered
Spud Date: 1993-12-20
Final Drill Date: 1994-01-16
Well Total Depth: 2700.00 m
Surface Hole Latitude: 55.080075
Surface Hole Longitude: -116.573079

For data sources see[1][2]

Well History

Date Event
1993-12-14 Obtained License
1993-12-22 Surface Casing Operation Performed
1993-12-29 Lost Circulation Occurred
1994-01-05 Plug Back Performed
1994-01-07 Direction Drilling Operation Performed - Straighten Hole
1994-01-16 Finished Drilling
1994-01-16 Well Log Performed
1994-01-18 Drill Stem Test Performed
1994-01-19 Drill Stem Test Performed
1994-01-21 Drill Stem Test Performed
1994-01-23 Production Casing Operation Performed
1994-01-24 Rig Released
1994-02-13 Well Log Performed
1994-02-14 Perforation Treatment Performed - Jet Perforation
1994-02-14 Well Log Performed
1994-02-21 Well Log Performed
1994-02-25 Perforation Treatment Performed - Bridge Plug No Cement Required
1994-02-25 Perforation Treatment Performed - Jet Perforation
1994-02-25 Well Log Performed
1994-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-03-04 Plug Back Performed
1994-03-04 Well Log Performed
1994-03-05 Well Mode changed to Drilled and Cased
1994-04-05 Well Log Performed
1995-02-15 Perforation Treatment Performed - Jet Perforation
1995-03-01 Perforation Treatment Performed - Bridge Plug No Cement Required
1995-03-01 Well Mode changed to Abandoned Zone
2003-12-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-12-16 Plug Back Performed
2003-12-17 Well Abandoned
2003-12-17 Well Mode changed to Abandoned and Re-entered

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-01-07 2247.00 Straighten Hole

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-02-14 Perforation 2632.00 2633.00 14
1994-02-14 Perforation 2617.50 2619.00 14
1994-02-25 Bridge Plug, No Cement 2630.50 2631.50 0
1994-02-25 Perforation 2616.00 2621.00 13
1994-03-04 Packing Device Capped w/Cement 2597.00 2605.00 0
1995-02-15 Perforation 2616.00 2621.00 13
1995-03-01 Bridge Plug, No Cement 2610.00 2611.00 0
2003-12-16 Packing Device Capped w/Cement 2598.00 2610.00 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-12-29 Lost Circulation 1324.00 1418.00

For data sources see[6]

References