If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0705113007000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.090607,"lon":-115.651408,"icon":""}]} |
Location: 00/07-30-070-11W5/0 | |
Location Alias: 00/07-30-70-11 W5M | |
Location Alias 2: 00/07-30-070-11 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 070 | |
Meridian: 5 | |
Range: 11 | |
Section: 30 | |
County/Municipality: Big Lakes County | |
Well Name: ACL SWANH 7-30-70-11 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0439006 | |
License Date: 2011-11-16 | |
License Status: Issued | |
Spud Date: 2011-11-26 | |
Final Drill Date: 2011-12-08 | |
Well Total Depth: 3025.00 m | |
Surface Hole Latitude: 55.090607 | |
Surface Hole Longitude: -115.651408 |
Date | Event |
---|---|
2011-11-16 | Obtained License |
2011-11-27 | Surface Casing Operation Performed |
2011-12-01 | Direction Drilling Operation Performed - Deviate |
2011-12-01 | Well Log Performed |
2011-12-05 | Intermediate Casing Operation Performed |
2011-12-06 | Direction Drilling Operation Performed - Horizontal |
2011-12-06 | Well Log Performed |
2011-12-08 | Finished Drilling |
2011-12-08 | Well Log Performed |
2011-12-08 | Well Mode changed to Drilled and Cased |
2011-12-10 | Liner Casing Operation Performed |
2011-12-10 | Perforation Treatment Performed - Open-Hole Completion |
2011-12-12 | Rig Released |
2012-01-06 | Well Log Performed |
2012-01-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-02 | Well Began Production |
2012-02-02 | Well Fluid changed to Crude Oil |
2012-02-02 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-12-01 | 2032.00 | Deviate (5 - 79 degrees) |
2011-12-06 | 2579.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-12-10 | Open Hole/Barefoot Completion | 2774.00 | 3025.00 | 0 |
2012-01-31 | Multi-Stage Fracture | 2568.80 | 2568.90 | 0 |
2012-01-31 | Multi-Stage Fracture | 2583.50 | 2583.60 | 0 |
2012-01-31 | Multi-Stage Fracture | 2607.80 | 2607.90 | 0 |
2012-01-31 | Multi-Stage Fracture | 2623.60 | 2623.70 | 0 |
2012-01-31 | Multi-Stage Fracture | 2638.20 | 2638.30 | 0 |
2012-01-31 | Multi-Stage Fracture | 2652.60 | 2652.70 | 0 |
2012-01-31 | Multi-Stage Fracture | 2667.30 | 2667.40 | 0 |
2012-01-31 | Multi-Stage Fracture | 2677.20 | 2677.30 | 0 |
2012-01-31 | Multi-Stage Fracture | 2692.80 | 2692.90 | 0 |
2012-01-31 | Multi-Stage Fracture | 2707.20 | 2707.30 | 0 |
2012-01-31 | Multi-Stage Fracture | 2425.60 | 2425.70 | 0 |
2012-01-31 | Multi-Stage Fracture | 2721.30 | 2721.40 | 0 |
2012-01-31 | Multi-Stage Fracture | 2736.50 | 2736.60 | 0 |
2012-01-31 | Multi-Stage Fracture | 2746.40 | 2746.50 | 0 |
2012-01-31 | Multi-Stage Fracture | 2442.70 | 2442.80 | 0 |
2012-01-31 | Multi-Stage Fracture | 2457.20 | 2457.30 | 0 |
2012-01-31 | Multi-Stage Fracture | 2485.80 | 2485.90 | 0 |
2012-01-31 | Multi-Stage Fracture | 2500.30 | 2500.40 | 0 |
2012-01-31 | Multi-Stage Fracture | 2524.20 | 2524.30 | 0 |
2012-01-31 | Multi-Stage Fracture | 2539.60 | 2539.70 | 0 |
2012-01-31 | Multi-Stage Fracture | 2554.30 | 2554.40 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7220 | 0.0 | 0.0 | 0.0 |
2013 | 6784 | 0.0 | 0.0 | 0.0 |
2014 | 7713 | 0.0 | 0.0 | 0.0 |
2015 | 8722 | 0.0 | 0.0 | 0.0 |
2016 | 8762 | 0.0 | 0.0 | 0.0 |
2017 | 6775 | 0.0 | 0.0 | 0.0 |
2018 | 8247 | 0.0 | 0.0 | 0.0 |
2019 | 8512 | 0.0 | 0.0 | 0.0 |
2020 | 220 | 0.0 | 0.0 | 0.0 |
For data sources see[6]