X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0705112412000

Well Details

Well ID: 0705112412000
Loading map...
Location: 00/12-24-070-11W5/0
Location Alias: 00/12-24-70-11 W5M
Location Alias 2: 00/12-24-070-11 W5/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 5
Range: 11
Section: 24
County/Municipality: Big Lakes County
Well Name: CALSTAN SHELL HOUSEMT 12-24-70-11
Operator Name: Cardinal Energy Ltd.
License Number: 0025668
License Date: 1964-02-10
License Status: Abandoned
Spud Date: 1964-02-15
Final Drill Date: 1964-03-07
Well Total Depth: 2294.80 m
Surface Hole Latitude: 55.077699
Surface Hole Longitude: -115.548782

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-02-10 Obtained License
1964-03-07 Finished Drilling
1964-03-07 Well Mode changed to Drilled and Cased
1964-03-09 Production Casing Operation Performed
1964-03-11 Perforation Treatment Performed - Open-Hole Completion
1964-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-06-09 Well Began Production
1964-06-09 Well Fluid changed to Crude Oil
1964-06-09 Well Mode changed to Pumping
1982-03-01 Well Fluid changed to Crude Oil
1982-03-01 Well Mode changed to Suspended
1995-08-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-08-15 Plug Back Performed
1995-08-16 Perforation Treatment Performed - Selective Jet Perforations
1995-08-17 Perforation Treatment Performed - Cement Plug
1995-08-17 Perforation Treatment Performed - Remedial Casing
1995-08-18 Perforation Treatment Performed - Open-Hole Completion
1995-08-19 Perforation Treatment Performed - Cement Plug
1995-08-19 Well Fluid changed to Crude Oil
1995-08-19 Well Mode changed to Abandoned
1995-08-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-03-11 Open Hole/Barefoot Completion 2273.80 2294.80 0
1964-03-24 Acid Treatment 2273.80 2294.80 0
1964-04-06 Acid Treatment 2273.80 2294.80 0
1995-08-15 Packing Device Capped w/Cement 1706.00 1725.00 0
1995-08-16 Selective Jet Perforations 389.00 389.00 0
1995-08-17 Remedial Casing Cementing 389.00 389.00 0
1995-08-17 Cement Plug 260.00 389.00 0
1995-08-18 Open Hole/Barefoot Completion 236.20 251.00 0
1995-08-19 Cement Plug 11.00 251.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 360 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1971 1728 0.0 0.0 0.0
1972 7165 0.0 0.0 0.0
1973 3047 0.0 0.0 0.0
1974 744 0.0 0.0 0.0
1982 1416 0.0 0.0 0.0

For data sources see[5]

References