X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0705112207000

Well Details

Well ID: 0705112207000
Loading map...
Location: 00/07-22-070-11W5/0
Location Alias: 00/07-22-70-11 W5M
Location Alias 2: 00/07-22-070-11 W5/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 5
Range: 11
Section: 22
County/Municipality: Big Lakes County
Well Name: ACL HZ SWANH 7-22-70-11
Operator Name: Cardinal Energy Ltd.
License Number: 0438006
License Date: 2011-10-25
License Status: Issued
Spud Date: 2011-12-18
Final Drill Date: 2012-01-09
Well Total Depth: 3199.00 m
Surface Hole Latitude: 55.075011
Surface Hole Longitude: -115.600575

For data sources see[1][2]

Well History

Date Event
2011-10-25 Obtained License
2011-12-20 Surface Casing Operation Performed
2012-01-01 Well Log Performed
2012-01-02 Direction Drilling Operation Performed - Deviate
2012-01-02 Well Log Performed
2012-01-04 Direction Drilling Operation Performed - Horizontal
2012-01-05 Intermediate Casing Operation Performed
2012-01-09 Finished Drilling
2012-01-09 Well Log Performed
2012-01-09 Well Mode changed to Drilled and Cased
2012-01-11 Liner Casing Operation Performed
2012-01-11 Perforation Treatment Performed - Open-Hole Completion
2012-01-12 Rig Released
2012-02-12 Well Log Performed
2012-02-18 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-20 Well Began Production
2012-02-20 Well Fluid changed to Crude Oil
2012-02-20 Well Mode changed to Flowing
2012-03-15 Well Fluid changed to Crude Oil
2012-03-15 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-01-02 2137.00 Deviate (5 - 79 degrees)
2012-01-04 2497.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-11 Open Hole/Barefoot Completion 3178.80 3199.00 0
2012-02-18 Multi-Stage Fracture 2656.20 2656.30 0
2012-02-18 Multi-Stage Fracture 2693.50 2693.60 0
2012-02-18 Multi-Stage Fracture 2707.80 2707.90 0
2012-02-18 Multi-Stage Fracture 2732.00 2732.10 0
2012-02-18 Multi-Stage Fracture 2744.40 2744.50 0
2012-02-18 Multi-Stage Fracture 2783.90 2784.00 0
2012-02-18 Multi-Stage Fracture 2798.30 2798.40 0
2012-02-18 Multi-Stage Fracture 2812.90 2813.00 0
2012-02-18 Multi-Stage Fracture 2827.40 2827.50 0
2012-02-18 Multi-Stage Fracture 2852.50 2852.60 0
2012-02-18 Multi-Stage Fracture 2476.00 2476.10 0
2012-02-18 Multi-Stage Fracture 2866.00 2866.10 0
2012-02-18 Multi-Stage Fracture 2892.80 2892.90 0
2012-02-18 Multi-Stage Fracture 2906.30 2906.40 0
2012-02-18 Multi-Stage Fracture 2944.10 2944.20 0
2012-02-18 Multi-Stage Fracture 2956.60 2956.70 0
2012-02-18 Multi-Stage Fracture 2984.30 2984.40 0
2012-02-18 Multi-Stage Fracture 2996.70 2996.80 0
2012-02-18 Multi-Stage Fracture 3034.20 3034.30 0
2012-02-18 Multi-Stage Fracture 3048.30 3048.40 0
2012-02-18 Multi-Stage Fracture 3062.40 3062.50 0
2012-02-18 Multi-Stage Fracture 2491.50 2491.60 0
2012-02-18 Multi-Stage Fracture 3074.80 3074.90 0
2012-02-18 Multi-Stage Fracture 3155.60 3155.70 0
2012-02-18 Multi-Stage Fracture 2515.20 2515.30 0
2012-02-18 Multi-Stage Fracture 2528.70 2528.80 0
2012-02-18 Multi-Stage Fracture 2541.10 2541.20 0
2012-02-18 Multi-Stage Fracture 2589.40 2589.50 0
2012-02-18 Multi-Stage Fracture 2617.00 2617.10 0
2012-02-18 Multi-Stage Fracture 2629.80 2629.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4861 0.0 0.0 0.0
2013 7820 0.0 0.0 0.0
2014 8119 0.0 0.0 0.0
2015 8489 0.0 0.0 0.0
2016 8168 0.0 0.0 0.0
2017 8086 0.0 0.0 0.0
2018 8490 0.0 0.0 0.0
2019 7669 0.0 0.0 0.0
2020 2166 0.0 0.0 0.0

For data sources see[6]

References