X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0705111607000

Well Details

Well ID: 0705111607000
Loading map...
Location: 00/07-16-070-11W5/0
Location Alias: 00/07-16-70-11 W5M
Location Alias 2: 00/07-16-070-11 W5/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 5
Range: 11
Section: 16
County/Municipality: Big Lakes County
Well Name: ACL HZ SWANH 7-16-70-11
Operator Name: Cardinal Energy Ltd.
License Number: 0459963
License Date: 2013-10-09
License Status: Issued
Spud Date: 2013-11-05
Final Drill Date: 2013-11-24
Well Total Depth: 3397.00 m
Surface Hole Latitude: 55.053073
Surface Hole Longitude: -115.606319

For data sources see[1][2]

Well History

Date Event
2011-11-17 Well Log Performed
2013-10-09 Obtained License
2013-11-07 Surface Casing Operation Performed
2013-11-12 Direction Drilling Operation Performed - Deviate
2013-11-16 Direction Drilling Operation Performed - Horizontal
2013-11-18 Intermediate Casing Operation Performed
2013-11-21 Well Log Performed
2013-11-23 Well Log Performed
2013-11-24 Finished Drilling
2013-11-24 Well Log Performed
2013-11-24 Well Mode changed to Drilled and Cased
2013-11-26 Liner Casing Operation Performed
2013-11-26 Perforation Treatment Performed - Open-Hole Completion
2013-11-27 Rig Released
2013-12-09 Perforation Treatment Performed - Multi-Stage Fracture
2014-02-01 Well Began Production
2014-02-01 Well Fluid changed to Crude Oil
2014-02-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-11-05 Horizon Drilling Inc. 25 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-11-12 2227.00 Deviate (5 - 79 degrees)
2013-11-16 2574.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-11-26 Open Hole/Barefoot Completion 3387.00 3397.00 0
2013-12-09 Multi-Stage Fracture 2900.80 2900.90 0
2013-12-09 Multi-Stage Fracture 2915.10 2915.20 0
2013-12-09 Multi-Stage Fracture 2943.40 2943.50 0
2013-12-09 Multi-Stage Fracture 2958.10 2958.20 0
2013-12-09 Multi-Stage Fracture 2991.60 2991.70 0
2013-12-09 Multi-Stage Fracture 3006.30 3006.40 0
2013-12-09 Multi-Stage Fracture 3035.30 3035.40 0
2013-12-09 Multi-Stage Fracture 3046.60 3046.70 0
2013-12-09 Multi-Stage Fracture 3080.00 3080.10 0
2013-12-09 Multi-Stage Fracture 3094.80 3094.90 0
2013-12-09 Multi-Stage Fracture 2734.50 2734.60 0
2013-12-09 Multi-Stage Fracture 3109.40 3109.50 0
2013-12-09 Multi-Stage Fracture 3137.60 3137.70 0
2013-12-09 Multi-Stage Fracture 3157.30 3157.40 0
2013-12-09 Multi-Stage Fracture 3171.60 3171.70 0
2013-12-09 Multi-Stage Fracture 3186.20 3186.30 0
2013-12-09 Multi-Stage Fracture 3200.60 3200.70 0
2013-12-09 Multi-Stage Fracture 3219.80 3219.90 0
2013-12-09 Multi-Stage Fracture 3234.50 3234.60 0
2013-12-09 Multi-Stage Fracture 3248.40 3248.50 0
2013-12-09 Multi-Stage Fracture 3262.40 3262.50 0
2013-12-09 Multi-Stage Fracture 2749.10 2749.20 0
2013-12-09 Multi-Stage Fracture 3296.00 3296.10 0
2013-12-09 Multi-Stage Fracture 3310.60 3310.70 0
2013-12-09 Multi-Stage Fracture 3337.70 3337.80 0
2013-12-09 Multi-Stage Fracture 3352.00 3352.10 0
2013-12-09 Multi-Stage Fracture 3377.70 3377.80 0
2013-12-09 Multi-Stage Fracture 2777.50 2777.60 0
2013-12-09 Multi-Stage Fracture 2791.90 2792.00 0
2013-12-09 Multi-Stage Fracture 2811.60 2811.70 0
2013-12-09 Multi-Stage Fracture 2826.30 2826.40 0
2013-12-09 Multi-Stage Fracture 2854.70 2854.80 0
2013-12-09 Multi-Stage Fracture 2869.40 2869.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-12-09 2013-12-09 2,516 1,581 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 ethylbenzene 100-41-4 100 20.2066 N/A
hydrochloric acid 7647-01-0 100 61.8246 N/A
methanol 67-56-1 100 4.4696 N/A
water Not Available 100 37.0644 N/A
xylene 1330-20-7 100 20.2066 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-12-05 2013-12-13 Municipal Water 124
2013-12-02 2013-12-07 Surface Water - Lake 76

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 6996 0.0 0.0 0.0
2015 8723 0.0 0.0 0.0
2016 8522 0.0 0.0 0.0
2017 7684 0.0 0.0 0.0
2018 7913 0.0 0.0 0.0
2019 7547 0.0 0.0 0.0
2020 2112 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-11-27 No Incident Encountered 0.00 0.00
2014-01-09 No Incident Encountered 0.00 0.00

For data sources see[10]

References