X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0705111504000

Well Details

Well ID: 0705111504000
Loading map...
Location: 00/04-15-070-11W5/0
Location Alias: 00/04-15-70-11 W5M
Location Alias 2: 00/04-15-070-11 W5/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 5
Range: 11
Section: 15
County/Municipality: Big Lakes County
Well Name: CHEVRON SHELL SWANH IN 4-15-70-11
Operator Name: Cardinal Energy Ltd.
License Number: 0027234
License Date: 1964-11-26
License Status: Suspension
Spud Date: 1965-01-10
Final Drill Date: 1965-02-06
Well Total Depth: 2526.80 m
Surface Hole Latitude: 55.055807
Surface Hole Longitude: -115.600025

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-11-26 Obtained License
1965-01-24 Lost Circulation Occurred
1965-02-06 Finished Drilling
1965-02-06 Well Mode changed to Drilled and Cased
1965-02-08 Production Casing Operation Performed
1965-03-15 Perforation Treatment Performed - Selective Bullet Perforations
1965-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-04-08 Well Began Production
1965-04-08 Well Fluid changed to Crude Oil
1965-04-08 Well Mode changed to Flowing
1966-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-05-06 Well Began Injection
1966-05-06 Well Fluid changed to Water
1966-05-06 Well Type changed to Injection
1992-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-03-12 Well Fluid changed to Water
1992-03-12 Well Mode changed to Suspended
1992-03-12 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-03-15 Selective Bullet Perforations 2480.50 2481.10 0
1965-03-15 Selective Bullet Perforations 2479.20 2479.90 0
1965-03-15 Selective Bullet Perforations 2478.00 2478.60 0
1965-03-15 Selective Bullet Perforations 2475.30 2475.90 0
1965-03-15 Selective Bullet Perforations 2470.10 2470.40 0
1965-03-15 Selective Bullet Perforations 2464.30 2466.70 0
1965-03-16 Acid Treatment 2464.30 2481.10 0
1966-01-23 Acid Treatment 2464.30 2481.10 0
1992-03-12 Packing Device Capped w/Cement 2419.00 2427.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1965-01-24 Lost Circulation 1827.20 1865.60

For data sources see[6]

References