If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0705111106000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.048394,"lon":-115.561784,"icon":""}]} |
Location: 00/06-11-070-11W5/0 | |
Location Alias: 00/06-11-70-11 W5M | |
Location Alias 2: 00/06-11-070-11 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 070 | |
Meridian: 5 | |
Range: 11 | |
Section: 11 | |
County/Municipality: Big Lakes County | |
Well Name: ACL HZ SWANH 6-11-70-11 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0428702 | |
License Date: 2010-12-22 | |
License Status: Amended | |
Spud Date: 2011-07-26 | |
Final Drill Date: 2011-08-09 | |
Well Total Depth: 3111.00 m | |
Surface Hole Latitude: 55.048394 | |
Surface Hole Longitude: -115.561784 |
Date | Event |
---|---|
2010-12-22 | Obtained License |
2011-07-28 | Surface Casing Operation Performed |
2011-08-02 | Direction Drilling Operation Performed - Deviate |
2011-08-02 | Well Log Performed |
2011-08-04 | Direction Drilling Operation Performed - Horizontal |
2011-08-04 | Well Log Performed |
2011-08-06 | Intermediate Casing Operation Performed |
2011-08-07 | Well Log Performed |
2011-08-09 | Finished Drilling |
2011-08-09 | Well Log Performed |
2011-08-09 | Well Mode changed to Drilled and Cased |
2011-08-11 | Liner Casing Operation Performed |
2011-08-11 | Perforation Treatment Performed - Open-Hole Completion |
2011-08-13 | Rig Released |
2011-09-04 | Well Log Performed |
2011-09-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-15 | Well Began Production |
2011-09-15 | Well Fluid changed to Crude Oil |
2011-09-15 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-08-02 | 2186.00 | Deviate (5 - 79 degrees) |
2011-08-04 | 2552.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-08-11 | Open Hole/Barefoot Completion | 3108.00 | 3111.00 | 0 |
2011-09-13 | Multi-Stage Fracture | 2754.90 | 2755.00 | 0 |
2011-09-13 | Multi-Stage Fracture | 2769.20 | 2769.30 | 0 |
2011-09-13 | Multi-Stage Fracture | 2783.60 | 2783.70 | 0 |
2011-09-13 | Multi-Stage Fracture | 2797.40 | 2797.50 | 0 |
2011-09-13 | Multi-Stage Fracture | 2822.80 | 2822.90 | 0 |
2011-09-13 | Multi-Stage Fracture | 2837.20 | 2837.30 | 0 |
2011-09-13 | Multi-Stage Fracture | 2851.60 | 2851.70 | 0 |
2011-09-13 | Multi-Stage Fracture | 2865.90 | 2866.00 | 0 |
2011-09-13 | Multi-Stage Fracture | 2904.60 | 2904.70 | 0 |
2011-09-13 | Multi-Stage Fracture | 2918.40 | 2918.50 | 0 |
2011-09-13 | Multi-Stage Fracture | 2618.50 | 2618.60 | 0 |
2011-09-13 | Multi-Stage Fracture | 2932.80 | 2932.90 | 0 |
2011-09-13 | Multi-Stage Fracture | 2945.80 | 2945.90 | 0 |
2011-09-13 | Multi-Stage Fracture | 2970.40 | 2970.50 | 0 |
2011-09-13 | Multi-Stage Fracture | 2984.50 | 2984.60 | 0 |
2011-09-13 | Multi-Stage Fracture | 2999.00 | 2999.10 | 0 |
2011-09-13 | Multi-Stage Fracture | 3013.40 | 3013.50 | 0 |
2011-09-13 | Multi-Stage Fracture | 2632.50 | 2632.60 | 0 |
2011-09-13 | Multi-Stage Fracture | 2646.70 | 2646.80 | 0 |
2011-09-13 | Multi-Stage Fracture | 2660.90 | 2661.00 | 0 |
2011-09-13 | Multi-Stage Fracture | 2686.30 | 2686.40 | 0 |
2011-09-13 | Multi-Stage Fracture | 2700.70 | 2700.80 | 0 |
2011-09-13 | Multi-Stage Fracture | 2725.20 | 2725.30 | 0 |
2011-09-13 | Multi-Stage Fracture | 2729.50 | 2729.60 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1767 | 0.0 | 0.0 | 0.0 |
2012 | 8555 | 0.0 | 0.0 | 0.0 |
2013 | 8195 | 0.0 | 0.0 | 0.0 |
2014 | 6929 | 0.0 | 0.0 | 0.0 |
2015 | 8723 | 0.0 | 0.0 | 0.0 |
2016 | 8771 | 0.0 | 0.0 | 0.0 |
2017 | 8725 | 0.0 | 0.0 | 0.0 |
2018 | 8439 | 0.0 | 0.0 | 0.0 |
2019 | 8486 | 0.0 | 0.0 | 0.0 |
2020 | 2158 | 0.0 | 0.0 | 0.0 |
For data sources see[6]