X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0705111104000

Well Details

Well ID: 0705111104000
Loading map...
Location: 00/04-11-070-11W5/0
Location Alias: 00/04-11-70-11 W5M
Location Alias 2: 00/04-11-070-11 W5/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 5
Range: 11
Section: 11
County/Municipality: Big Lakes County
Well Name: ACL ET AL SWAN HILLS 4-11-70-11
Operator Name: Cardinal Energy Ltd.
License Number: 0029929
License Date: 1966-02-01
License Status: Abandoned
Spud Date: 1966-02-10
Final Drill Date: 1966-02-27
Well Total Depth: 2466.40 m
Surface Hole Latitude: 55.040938
Surface Hole Longitude: -115.574169

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-02-01 Obtained License
1966-02-24 Production Casing Operation Performed
1966-02-26 Perforation Treatment Performed - Open-Hole Completion
1966-02-27 Finished Drilling
1966-02-27 Well Mode changed to Drilled and Cased
1966-02-28 Perforation Treatment Performed - Acid Wash - No Pressure
1966-03-01 Perforation Treatment Performed - Acid Wash - No Pressure
1966-03-22 Well Began Production
1966-03-22 Well Fluid changed to Crude Oil
1966-03-22 Well Mode changed to Pumping
2004-05-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-05-03 Plug Back Performed
2004-05-03 Well Fluid changed to Crude Oil
2004-05-03 Well Mode changed to Abandoned Zone
2004-05-05 Perforation Treatment Performed - Jet Perforation
2004-05-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-05-06 Perforation Treatment Performed - Remedial Casing
2004-05-08 Well Abandoned
2004-05-08 Well Fluid changed to Crude Oil
2004-05-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-02-26 Open Hole/Barefoot Completion 2433.50 2466.40 0
1966-02-28 Acid Wash 2433.50 2466.40 0
1966-03-01 Acid Wash 2433.50 2466.40 0
2004-05-03 Packing Device Capped w/Cement 2417.00 2425.00 0
2004-05-05 Perforation 600.00 600.30 13
2004-05-06 Remedial Casing Cementing 600.00 600.30 0
2004-05-06 Packing Device Capped w/Cement 581.10 595.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 408 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1974 958 0.0 0.0 0.0
1977 917 0.0 0.0 0.0
1980 1464 0.0 0.0 0.0
1981 7884 0.0 0.0 0.0
1982 7612 0.0 0.0 0.0
1983 8528 0.0 0.0 0.0
1984 8687 0.0 0.0 0.0
1985 8460 0.0 0.0 0.0
1986 8706 0.0 0.0 0.0
1987 8638 0.0 0.0 0.0
1988 8458 0.0 0.0 0.0
1989 6928 0.0 0.0 0.0
1990 8261 0.0 0.0 0.0
1991 6898 0.0 0.0 0.0
1992 2926 0.0 0.0 0.0
1993 6075 0.0 0.0 0.0
1994 8202 0.0 0.0 0.0
1995 7922 0.0 0.0 0.0
1996 6853 0.0 0.0 0.0
1997 8476 0.0 0.0 0.0
1998 7813 0.0 0.0 0.0
1999 8211 0.0 0.0 0.0
2000 7549 0.0 0.0 0.0
2001 8204 0.0 0.0 0.0
2002 4440 0.0 0.0 0.0
2003 7004 0.0 0.0 0.0
2004 2737 0.0 0.0 0.0

For data sources see[5]

References