If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0705110102000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.026939,"lon":-115.536311,"icon":""}]} |
Location: 00/02-01-070-11W5/0 | |
Location Alias: 00/02-01-70-11 W5M | |
Location Alias 2: 00/02-01-070-11 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 070 | |
Meridian: 5 | |
Range: 11 | |
Section: 01 | |
County/Municipality: Big Lakes County | |
Well Name: CALSTAN SOBC HOUSEMT 2-1-70-11 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0026194 | |
License Date: 1964-06-02 | |
License Status: Abandoned | |
Spud Date: 1964-06-22 | |
Final Drill Date: 1964-07-07 | |
Well Total Depth: 2311.00 m | |
Surface Hole Latitude: 55.026939 | |
Surface Hole Longitude: -115.536311 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1964-06-02 | Obtained License |
1964-07-07 | Finished Drilling |
1964-07-07 | Well Mode changed to Drilled and Cased |
1964-07-09 | Production Casing Operation Performed |
1964-07-10 | Perforation Treatment Performed - Open-Hole Completion |
1964-07-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1964-12-09 | Well Began Production |
1964-12-09 | Well Fluid changed to Crude Oil |
1964-12-09 | Well Mode changed to Pumping |
1983-12-16 | Well Fluid changed to Crude Oil |
1983-12-16 | Well Mode changed to Suspended |
2009-03-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-03-25 | Plug Back Performed |
2009-03-25 | Well Fluid changed to Crude Oil |
2009-03-25 | Well Mode changed to Abandoned Zone |
2009-03-26 | Perforation Treatment Performed - Cement Plug |
2009-03-28 | Perforation Treatment Performed - Jet Perforation |
2009-03-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-03-29 | Perforation Treatment Performed - Remedial Casing |
2009-03-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-03-30 | Perforation Treatment Performed - Jet Perforation |
2009-03-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-03-31 | Perforation Treatment Performed - Jet Perforation |
2009-04-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-04-02 | Perforation Treatment Performed - Jet Perforation |
2009-04-02 | Perforation Treatment Performed - Remedial Casing |
2009-04-04 | Well Abandoned |
2009-04-04 | Well Fluid changed to Crude Oil |
2009-04-04 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1964-07-10 | Open Hole/Barefoot Completion | 2281.70 | 2311.00 | 0 |
2009-03-30 | Packing Device Capped w/Cement | 876.60 | 886.00 | 0 |
2009-03-30 | Perforation | 571.00 | 572.00 | 13 |
2009-03-30 | Packing Device Capped w/Cement | 559.60 | 569.00 | 0 |
2009-03-31 | Perforation | 464.00 | 465.00 | 13 |
2009-03-31 | Packing Device Capped w/Cement | 452.60 | 462.00 | 0 |
2009-03-31 | Perforation | 412.00 | 413.00 | 13 |
2009-03-31 | Packing Device Capped w/Cement | 400.60 | 410.00 | 0 |
2009-04-02 | Perforation | 248.00 | 249.00 | 13 |
2009-04-02 | Remedial Casing Cementing | 248.00 | 249.00 | 0 |
2009-04-02 | Packing Device Capped w/Cement | 227.00 | 246.00 | 0 |
1964-07-29 | Acid Treatment | 2281.70 | 2311.00 | 0 |
2009-03-25 | Packing Device Capped w/Cement | 2257.00 | 2269.00 | 0 |
2009-03-26 | Cement Plug | 1139.50 | 1324.00 | 0 |
2009-03-26 | Cement Plug | 1060.00 | 1139.50 | 0 |
2009-03-28 | Perforation | 915.00 | 916.00 | 13 |
2009-03-29 | Remedial Casing Cementing | 915.00 | 916.00 | 0 |
2009-03-29 | Packing Device Capped w/Cement | 904.40 | 913.90 | 0 |
2009-03-30 | Perforation | 888.00 | 889.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1978 | 1416 | 0.0 | 0.0 | 0.0 |
1980 | 7389 | 0.0 | 0.0 | 0.0 |
1981 | 4272 | 0.0 | 0.0 | 0.0 |
1982 | 4488 | 0.0 | 0.0 | 0.0 |
1983 | 1080 | 0.0 | 0.0 | 0.0 |
1987 | 720 | 0.0 | 0.0 | 0.0 |
For data sources see[5]