X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0705101812000

Well Details

Well ID: 0705101812000
Loading map...
Location: 00/12-18-070-10W5/0
Location Alias: 00/12-18-70-10 W5M
Location Alias 2: 00/12-18-070-10 W5/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 5
Range: 10
Section: 18
County/Municipality: Big Lakes County
Well Name: ACL ET AL SWANH 12-18-70-10
Operator Name: Cardinal Energy Ltd.
License Number: 0027713
License Date: 1965-02-09
License Status: Abandoned
Spud Date: 1965-02-18
Final Drill Date: 1965-03-10
Well Total Depth: 2350.60 m
Surface Hole Latitude: 55.062848
Surface Hole Longitude: -115.524282

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-02-09 Obtained License
1965-03-10 Finished Drilling
1965-03-10 Well Mode changed to Drilled and Cased
1965-03-12 Production Casing Operation Performed
1965-03-21 Perforation Treatment Performed - Jet Perforation
1965-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-03-26 Well Began Production
1965-03-26 Well Fluid changed to Crude Oil
1965-03-26 Well Mode changed to Flowing
1966-03-12 Well Fluid changed to Crude Oil
1966-03-12 Well Mode changed to Pumping
1980-11-01 Well Fluid changed to Crude Oil
1980-11-01 Well Mode changed to Suspended
2001-06-18 Perforation Treatment Performed - Jet Perforation
2001-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-06-28 Well Fluid changed to Crude Oil
2001-06-28 Well Mode changed to Pumping
2002-01-01 Well Fluid changed to Crude Oil
2002-01-01 Well Mode changed to Suspended
2007-09-25 Well Fluid changed to Crude Oil
2007-09-25 Well Mode changed to Pumping
2013-12-18 Well Fluid changed to Crude Oil
2013-12-18 Well Mode changed to Suspended
2014-02-17 Well Log Performed
2014-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-02-20 Plug Back Performed
2014-02-20 Well Fluid changed to Crude Oil
2014-02-20 Well Mode changed to Abandoned Zone
2014-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-02-22 Perforation Treatment Performed - Jet Perforation
2014-02-22 Perforation Treatment Performed - Remedial Casing
2014-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-02-23 Perforation Treatment Performed - Jet Perforation
2014-02-23 Perforation Treatment Performed - Remedial Casing
2014-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-02-24 Perforation Treatment Performed - Jet Perforation
2014-02-24 Perforation Treatment Performed - Remedial Casing
2014-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-02-25 Perforation Treatment Performed - Jet Perforation
2014-02-25 Perforation Treatment Performed - Remedial Casing
2014-02-26 Perforation Treatment Performed - Remedial Casing
2014-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-02-27 Well Abandoned
2015-02-27 Well Fluid changed to Crude Oil
2015-02-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-03-21 Perforation 2328.40 2329.60 7
2014-02-22 Remedial Casing Cementing 939.00 940.00 0
2014-02-22 Packing Device Capped w/Cement 926.00 935.00 0
2014-02-23 Perforation 498.00 499.00 20
2014-02-23 Remedial Casing Cementing 498.00 499.00 0
2014-02-23 Packing Device Capped w/Cement 487.00 496.00 0
2014-02-24 Perforation 436.00 437.00 20
2014-02-24 Remedial Casing Cementing 436.00 437.00 0
2014-02-24 Packing Device Capped w/Cement 425.00 434.00 0
2014-02-25 Perforation 384.00 385.00 20
2014-02-25 Remedial Casing Cementing 384.00 385.00 0
1965-03-21 Perforation 2332.60 2335.10 7
2014-02-25 Packing Device Capped w/Cement 372.00 381.00 0
2014-02-25 Perforation 226.00 227.00 20
2014-02-26 Remedial Casing Cementing 226.00 227.00 0
2014-02-27 Packing Device Capped w/Cement 215.00 223.00 0
1965-03-22 Acid Treatment 2328.40 2335.10 0
2001-06-18 Perforation 2328.20 2335.00 20
2001-06-19 Acid Treatment 2328.00 2335.00 0
2014-02-20 Packing Device Capped w/Cement 2312.00 2320.00 0
2014-02-21 Packing Device Capped w/Cement 1334.00 1342.00 0
2014-02-21 Packing Device Capped w/Cement 1053.00 1061.00 0
2014-02-22 Perforation 939.00 940.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 2184 0.0 0.0 0.0
1968 2711 0.0 0.0 0.0
1969 8088 0.0 0.0 0.0
1970 8085 0.0 0.0 0.0
1971 7959 0.0 0.0 0.0
1972 7463 0.0 0.0 0.0
1973 8129 0.0 0.0 0.0
1974 5992 0.0 0.0 0.0
1975 5166 0.0 0.0 0.0
1976 4336 0.0 0.0 0.0
1977 7485 0.0 0.0 0.0
1978 7781 0.0 0.0 0.0
1979 7726 0.0 0.0 0.0
1980 6167 0.0 0.0 0.0
2001 4198 0.0 0.0 0.0
2007 2026 0.0 0.0 0.0
2008 8132 0.0 0.0 0.0
2009 8097 0.0 0.0 0.0
2010 7341 0.0 0.0 0.0
2011 7987 0.0 0.0 0.0
2012 8319 0.0 0.0 0.0
2013 7146 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-12-18 No Incident Encountered 0.00 0.00
2014-02-27 No Incident Encountered 0.00 0.00

For data sources see[6]

References