If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0704030815080 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.056907,"lon":-110.427676,"icon":""}]} |
Location: 08/15-08-070-03W4/0 | |
Location Alias: 08/15-08-70-03 W4M | |
Location Alias 2: 08/15-08-070-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 070 | |
Meridian: 4 | |
Range: 03 | |
Section: 08 | |
County/Municipality: Improvement District No. 349 | |
Well Name: CVE FCCL E10P04 FISHER 15-8-70-3 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0410050 | |
License Date: 2009-04-07 | |
License Status: Amended | |
Spud Date: 2009-05-20 | |
Final Drill Date: 2009-06-16 | |
Well Total Depth: 1232.00 m | |
Surface Hole Latitude: 55.056907 | |
Surface Hole Longitude: -110.427676 |
Date | Event |
---|---|
2009-04-07 | Obtained License |
2009-05-20 | Direction Drilling Operation Performed - Deviate |
2009-05-21 | Surface Casing Operation Performed |
2009-06-06 | Direction Drilling Operation Performed - Horizontal |
2009-06-10 | Well Log Performed |
2009-06-12 | Intermediate Casing Operation Performed |
2009-06-16 | Finished Drilling |
2009-06-16 | Perforation Treatment Performed - Open-Hole Completion |
2009-06-16 | Well Log Performed |
2009-06-16 | Well Structure changed to Drain |
2009-06-18 | Rig Released |
2009-07-18 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-05-20 | 227.00 | Deviate (5 - 79 degrees) |
2009-06-06 | 639.80 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-06-16 | Open Hole/Barefoot Completion | 736.00 | 1232.00 | 0 |
For data sources see[5]